238200
10 Lafayette Street LEWISTON, ME 04240
.24
Map 173, Lot 19
44.1018363 / -70.19692580000003
2
Lariviere, William
Lariviere.William@epa.gov
NOT_FOUND


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Androscoggin Valley Council of GovernmentsBF00A00443MEAssessment2017
Environmental Protection Maine Department of4W00A00902MESection 128(a) State/Tribal2022


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Supplemental Assessment$6,180.2011/01/202312/22/2023Environmental Protection Maine Department ofYFY24
Supplemental Assessment$6,575.0007/02/2018Androscoggin Valley Council of GovernmentsN


Is Cleanup Necessary? Yes
EPA Assessment Funding: $12,755.20
Leveraged Funding:
Total Funding: $12,755.20


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Asbestos
Lead
PAHS
Petroleum Products
SVOCs
VOCs
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Ground Water
Soil
NOT Cleaned up
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .24
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls



Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Former Use: The Site was developed with a wagon repair shop, steam dye facility, and dry cleaning operation circa 1914 and is located in a mixed commercial and residential area in the City of Lewiston. The main Site building with dry cleaning operations was constructed on the Site circa 1955 and consists of a brick-supported single-story commercial building constructed on a concrete slab. The current and former dry cleaner units were located along the northwestern wall of the main Site building between 1955 and 2014. According to Sanborn Maps dating back to the early 1900?s, historical dry cleaning operations took place in the current boiler room. Mr. LeBlanc, the Site owner, had no information regarding operations that took place prior to 1955 or in the boiler room section of the building. Tetrachloroethene or perchlorethylene (PCE or PERC) was the primary dry cleaning solvent. Dry cleaning operations ceased in November 2014. Significant staining was noted under and adjacent to the former dry cleaning units, as well as throughout the Site building.
Commercial (.24)


Top of Page