East Wheeling Community Park
Private
252489
Grandview Street WHEELING, WV 26003
60
Multiple
40.0694670523954 / -80.71660589316112
2
Nowak, Joseph
Nowak.Joseph@epa.gov
215-814-3303


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Belomar Regional CouncilBF96388001WVAssessment2021


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$8,405.7511/04/202103/22/2022Belomar Regional CouncilYFY22
Phase II Environmental Assessment$34,102.7506/30/202203/03/2023Belomar Regional Council


Is Cleanup Necessary? Unknown
EPA Assessment Funding: $42,508.50
Leveraged Funding:
Total Funding: $42,508.50


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

Selected Strategy(ies)Explanatory Text
Adoption of climate-conscious building codesBuilding codes can encourage implementation of climate change mitigation and adaptation techniques. Codes may require that infrastructure be planned and built to avoid or minimize future damage from flooding, drought, and other projected weather events resulting from climate changes. Codes may also reduce carbon emissions from commercial and residential buildings by specifying minimum requirements for building components such as insulation, water use, heating and cooling systems, lighting, windows, and ventilation systems. Effective building code requirements may vary regionally due to climate differences."
Climate-focused Phase I and Phase II ESAsClimate-focused Phase 1 ESAs may consider current and on-going climate change impacts and consider future impacts to the site or area. For example, an investigation of the site history can include an investigation of site vulnerabilities based on historical and recent climate patterns and events (e.g., floods and drought). Climate-focused Phase 2 ESAs may include use of renewable energy, incorporating remote sensing capabilities, maximize reuse of existing wells (as appropriate) and/or design wells for future reuse, use of field test kits when possible, use of local laboratories when possible, and use of appropriate sized equipment for the project."
Updates to floodplain, coastal and wetland, and /or hazard mitigation plansUpdated plans should consider the impact of both current and projected climate-related conditions (e.g., sea level rise, proximity to a flood plain, and the frequency and severity of major storm events and droughts) on the long-term safety, stability and suitability of the proposed land reuses."
Evaluate Reuse options that are climate consciousDiscussion of observed and forecasted climate change conditions and the associated site-specific risk are part of any reuse considerations. Both current and forecasted climate changes may impact the effectiveness of a remedial alternative."
Identify potential risk factors and infrastructure or utility vulnerabilitiesIdentify potential risk factors and vulnerabilities resulting directly from the impacts of climate change." Possible risk factors and vulnerabilities may include proximity to the ocean, infrastructure vulnerabilities, property affected by a revised FEMA flood plain map, vulnerability related to changes in frequency and intensity of precipitation events, vulnerability of soil type due to moisture and hydraulic changes, and ground and surface drinking water vulnerabilities."


Top of Page


Contaminants and Media


Arsenic
Lead
Other Metals
PAHS
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Ground Water
Soil
Surface Water
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 60
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls



Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The Edible Mountain Property consists of the land east of Stone Boulevard and Grandview Street, starting at intersection with Stone Boulevard, south along to Charles Street and east to intersection of McColloch Street at Lind Street in Wheeling, WV.

The northern portion of the Property was the site of the City of Wheeling trash incinerator from the 1910's through the 1950's. The areas adjacent to the incinerator were used as uncontrolled dumps for incombustible materials, including large volumes of glass. The eastern portion of the Property was historically used as vineyards for the Catholic Church in the early 1900's, as well as houses and some apartment complexes that were demolished and removed in the 1990's.

The Site is currently owned by the City of Wheeling, Grow OV, Urban Renewal Authority of Wheeling (URAW), and Wheeling Housing Authority, and is operated by Grow OV, a 501(c)3 nonprofit organization. Grow OV, in partnership and cooperation with the City of Wheeling, Fun-Raiser, Operation YURT, West Virginia University School of Public Health Prevention Resource Center, FARMacy, Wheeling Health Right, West Virginia Bureau of Public Health, West Virginia University Extension - Ohio County, and others have formed a coalition with the goal of transforming the Site into a youth wellness hub that aims to increase access to local food, physical fitness, social connection, and creative exploration. Site plans include local food production (greenhouses, gardens, orchards, etc.) as well as hiking and biking trails, an agroforestry area, and hospitality areas. Recognized environmental conditions (RECs) were identified as follows:

* Incineration and dumping - The presence of the historical incinerator and its associated dumping on the Property is a REC.

* Pesticides - Due to the historical vineyard on the Property, it is presumed that pre-regulated pesticides would have been applied during the 1800s and early 1900s. The potential for unregulated use of pesticides is a REC.

* Abandoned Mine Lands (AML) - Two slips and exposed earth are located on the Property. The slips may be a product of AML on the Property. One is located on the side of Grandview Street which has created large cracks in the road. The other slip is located on the Grow OV activity area near the greenhouses and the Yurt. The presence of AML may impact the Site by introducing mining-related contaminants to soil and groundwater.