Profile Information

Great Stone Viaduct, GSV
Private
252778
Between 26th and 32nd St BELLAIRE, OH 43906
3.31
29-90008.004; 29.90008.005; 29-90008.006
40.01441112246224 / -80.74467238600786
6
Auker, Karla
auker.karla@epa.gov
440-250-1741


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Belomar Regional CouncilBF96388001WVAssessment2021
Ohio Environmental Protection AgencyRP04E01546OHSection 128(a) State/Tribal2018


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase II Environmental Assessment$28,379.4202/23/2022Belomar Regional Council
Phase II Environmental Assessment$11,025.0001/30/201905/02/2019Ohio Environmental Protection AgencyYFY23


Is Cleanup Necessary? Yes
EPA Assessment Funding: $39,404.42
Leveraged Funding:
Total Funding: $39,404.42


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

Selected Strategy(ies)Explanatory Text
Adoption of climate-conscious building codesBuilding codes can encourage implementation of climate change mitigation and adaptation techniques. Codes may require that infrastructure be planned and built to avoid or minimize future damage from flooding, drought, and other projected weather events resulting from climate changes. Codes may also reduce carbon emissions from commercial and residential buildings by specifying minimum requirements for building components such as insulation, water use, heating and cooling systems, lighting, windows, and ventilation systems. Effective building code requirements may vary regionally due to climate differences."
Climate-focused Phase I and Phase II ESAsClimate-focused Phase 1 ESAs may consider current and on-going climate change impacts and consider future impacts to the site or area. For example, an investigation of the site history can include an investigation of site vulnerabilities based on historical and recent climate patterns and events (e.g., floods and drought). Climate-focused Phase 2 ESAs may include use of renewable energy, incorporating remote sensing capabilities, maximize reuse of existing wells (as appropriate) and/or design wells for future reuse, use of field test kits when possible, use of local laboratories when possible, and use of appropriate sized equipment for the project."
Updates to floodplain, coastal and wetland, and /or hazard mitigation plansUpdated plans should consider the impact of both current and projected climate-related conditions (e.g., sea level rise, proximity to a flood plain, and the frequency and severity of major storm events and droughts) on the long-term safety, stability and suitability of the proposed land reuses."
Evaluate Reuse options that are climate consciousDiscussion of observed and forecasted climate change conditions and the associated site-specific risk are part of any reuse considerations. Both current and forecasted climate changes may impact the effectiveness of a remedial alternative."
Identify potential risk factors and infrastructure or utility vulnerabilitiesIdentify potential risk factors and vulnerabilities resulting directly from the impacts of climate change." Possible risk factors and vulnerabilities may include proximity to the ocean, infrastructure vulnerabilities, property affected by a revised FEMA flood plain map, vulnerability related to changes in frequency and intensity of precipitation events, vulnerability of soil type due to moisture and hydraulic changes, and ground and surface drinking water vulnerabilities."


Top of Page


Contaminants and Media


Arsenic
Lead
Other Metals
VOCs
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Soil
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 3.31
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

Yes
Government Controls
No
Yes
Other SSD system is in place
It is unknown at this time what controls will be used.


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

This property is owned by the Great Stone Viaduct Historical Education Society, Inc. The Society purchased the parcels from CSX with use restrictions. They are working to clean up the properties and change the use restrictions. The society secured a grant to put a trail on the rail portion of the three properties and that project is currently under way. Nine VOCs were reported in soil samples above the respective MDLs, including the following:
2-Butanone Acetone, Benzene, Carbon, Disulfide,
Cyclohexane, Ethylbenzene, Isopropylbenzene, Methylene, Chloride, Toluene.
Industry (3.31)