Shipyard North
Government
10563
239 ARNDT STREET GREEN BAY, WI 54303
7
3-551
44.511851 / -88.0222579
8
Kennedy, Brian
kennedy.brian@epa.gov
312-353-4383


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
City of Green BayBF00E01245WIAssessment2013
Green Bay Redevelopment AuthorityBF00E02716WICleanup2019
Green Bay, City of BF00E02279WIAssessment2017
R5 TBA - Wisconsin (Pre-law Superfund TBA)n/aWITBA1998


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Cleanup Planning$3,977.0012/10/2018Green Bay, City of N
Cleanup Planning$3,977.0012/10/2018Green Bay, City of N
Cleanup Planning$15,022.3111/15/2018Green Bay, City of N
Cleanup Planning$15,022.3111/15/2018Green Bay, City of N
Cleanup Planning$3,977.0012/10/2018Green Bay, City of N
Cleanup Planning$15,022.3111/15/2018Green Bay, City of N
Phase I Environmental Assessment09/13/201610/21/2016City of Green BayN
Phase I Environmental Assessment09/13/201610/21/2016City of Green BayN
Phase I Environmental Assessment09/13/201610/21/2016City of Green BayN
Phase II Environmental Assessment01/17/201702/14/2017City of Green BayN
Phase II Environmental Assessment01/17/201702/14/2017City of Green BayN
Phase II Environmental Assessment$1.0006/16/199706/16/1997R5 TBA - Wisconsin (Pre-law Superfund TBA)NFY06
Phase II Environmental Assessment01/17/201702/14/2017City of Green BayN
Phase II Environmental Assessment$1.0006/16/199706/16/1997R5 TBA - Wisconsin (Pre-law Superfund TBA)NFY06
Phase II Environmental Assessment$1.0006/16/199706/16/1997R5 TBA - Wisconsin (Pre-law Superfund TBA)NFY06


Is Cleanup Necessary? Yes
EPA Assessment Funding: $57,000.93
Leveraged Funding: $45,828.00
Total Funding: $102,828.93


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

Selected Strategy(ies)Explanatory Text
N/AThis property does not incorporate planning or assessment activities to address climate change impacts


Top of Page


Contaminants and Media


Arsenic
Other Metals
PAHS
Selenium (Se)
VOCs
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Ground Water
Soil
NOT Cleaned up
NOT Cleaned up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
06/15/2019Green Bay, City of No
06/15/2019Green Bay, City of No
06/15/2019Green Bay, City of No
11/30/2019Green Bay Redevelopment AuthorityNo
11/30/2019Green Bay Redevelopment AuthorityNo
11/30/2019Green Bay Redevelopment AuthorityNo
11/30/2019$250,000.00Green Bay Redevelopment AuthorityNo
11/30/2019$250,000.00Green Bay Redevelopment AuthorityNo
11/30/2019$250,000.00Green Bay Redevelopment AuthorityNo
11/30/2019Green Bay Redevelopment AuthorityNo
11/30/2019Green Bay Redevelopment AuthorityNo
11/30/2019Green Bay Redevelopment AuthorityNo
11/30/2019Green Bay Redevelopment AuthorityNo
11/30/2019Green Bay Redevelopment AuthorityNo
11/30/2019Green Bay Redevelopment AuthorityNo


Cleanup/Treatment Implemented: Y
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info: The primary method of remediation utilized was capping with clean soil, which was transported to the site in 2008 and significantly enhanced and expanded in 2020. Additional hard surface capping is underway as part of site redevelopment.
Address of Data Source: https://dnr.wi.gov/botw/GetActivityDetail.do?detailSeqNo213757
Total ACRES Cleaned Up: 7
Number of Cleanup Jobs Leveraged: 720
EPA Cleanup Funding: $750,000.00
Leveraged Funding: $3,094,290.00
Cost Share Funding: $150,000.00
Total Funding: $3,994,290.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

Selected Strategy(ies)Explanatory Text
Selection and design of cleanup considered the site's climate change vulnerabilitiesClimate change vulnerability describes the degree to which natural, built, and human systems are at risk of exposure to climate change impacts.
Design of cleanup allowed for siting of climate resiliency measures in site reuseClimate resiliency is defined as the capacity of a system to maintain function in the face of stresses imposed by climate change and to adapt the system to be better prepared for future climate impacts.
Reduce waste and manage materials sustainablyPractices to reduce water and manage materials sustainably may include minimizing consumption of virgin materials; minimizing waste generation; use of recycled products and local materials; beneficially reusing waste materials (e.g. concrete made with coal combustion products replacing a portion of cement); and segregating and reusing or recycling materials, products, and infrastructure (e.g. soil, construction and demolition debris, buildings)."
Reduce water use and impacts to water sourcesPractices to reduce water use and impacts to water sources may include minimizing water use and depletion of natural water resources; capturing, reclaiming, and storing water for reuse (e.g., recharge aquifer, drinking water irrigation); minimizing water demand for revegetation (e.g., native species); and employing stormwater best management practice (e.g., installing and maintaining silt fences and basins to capture sediment runoff along sloped areas; use of gravel roads, porous pavement, and separated permeable surfaces to maximize infiltration of rainwater into the soil)."
Sustainable land management practicesSustainable land management practices capitalize on a "whole-site" approach that accelerates cleanup while returning a site to its natural conditions. Practices focus on opportunities to preserve natural land features, maintain open space, sequester carbon, enhance biodiversity, increase wildlife habitat, and minimize surface and subsurface disturbance. Sustainable land management practices at a brownfields site may include minimizing unnecessary soil and habitat disturbance or destruction; use of native species to support habitat; and onsite remediation approaches such as bioremediation and/or phytoremediation."


Top of Page


Institutional and Engineering Controls

Yes
Enforcement/Permit Tools Information Devices
The site is registered in the Wisconsin Department of Natural Resources Bureau for Remediation and Redevelopment Tracking System (BRRTS).
https://apps.dnr.wi.gov/botw/GetActivityDetail.do?dsn584672&siteId7097500&crumb1
Yes
08/25/2004
Yes
Cover Technologies (e.g., Capping) Security (e.g., Guard, Fences)
The primary method of remediation utilized was capping with clean soil, which was transported to the site in 2008 and significantly enhanced and expanded in 2020. Additional hard surface capping is underway as part of site redevelopment.
http://dnr.wi.gov/botw/GetActivityDetail.do?siteId7097500&adn0305213757
Yes
09/18/2008


Top of Page


Redevelopment and Other Leveraged Accomplishments

Start DateLeveraged FundingCACompletion Date
08/31/2022$89,510.00Green Bay Redevelopment Authority
08/31/2022$3,212,373.84Green Bay Redevelopment Authority
08/31/2022$3,212,373.84Green Bay Redevelopment Authority
08/31/2022$282,650.00Green Bay Redevelopment Authority
08/31/2022$89,510.00Green Bay Redevelopment Authority
08/31/2022$282,650.00Green Bay Redevelopment Authority
08/31/2022$3,212,373.84Green Bay Redevelopment Authority
08/31/2022$282,650.00Green Bay Redevelopment Authority
08/31/2022$89,510.00Green Bay Redevelopment Authority


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

Selected Strategy(ies)Explanatory Text
Install green infrastructureGreen infrastructure includes practices and features to reduce the burden of storm events on local water infrastructure. Examples include green roofs, downspout disconnection, urban tree canopies, rainwater harvesting, rain gardens, planter boxes, green parking (permeable pavement), urban agriculture, and community open space."
Incorporate and encourage multi-modal transit opportunities in redevelopment activitiesPlanning, designing and building streets that enable access for all users, including pedestrians, bicyclists, motorists and transit riders. Brownfield redevelopment projects can incorporate sidewalks in their plans to allow for pedestrian traffic, outdoor public spaces to encourage community gatherings, and bicycle parking, bike share rentals, and bike trails to encourage biking throughout the community."


Top of Page


Additional Property Attributes

Current Condition/Description: The Riverfront Parcel is a vacant brownfield site which has been capped. WDNR site closure has been obtained with continuing obligations. Future redevelopment requires a cap-modification plan with additional remediation to accommodate non-industrial uses. Former Use/Ownership: From at least the 1883 to 1907, the Property was primarily used as a lumber yard and coal storage and distribution facility, with the assumed transfer of materials between cargo ships and railcars. The National Coal & Supply Co. occupied the Property from at least 1936 to the early 1980s, with most of the Property used to store coal. During the 1960s, a building likely used by a furniture manufacturing business was constructed on northern end of the Property. Future Use: The site, along with adjacent parcels, is proposed to be redeveloped as part of the City/RDA's Shipyard project. The adjacent Green Bay and Western Rail site is planned to be redeveloped with a public outdoor event space, marina, urban beach, and shipping container merchant park/business incubator. Approved future redevelopment of the Riverfront Property includes the construction of two four-story buildings. One building is planned to include a 4,000 square foot restaurant, underground parking, and 129 market-rate apartment units. The second building is planned to include 96 market-rate apartment units. A public trail is planned to be constructed along the entire span of the property's waterfront. The WDNR approved a post closure cap modification plan for the site in June 2021 and a Materials Management Plan in March 2022. Construction on shoreline improvements is taking place in 2022 and 2023. Construction on the private mixed-use development is anticipated to start in early 2024.
Industry (6.9)
Hazardous & Petroleum
ID Number (if Applicable): 03-05-213757 Enrolled: 09/09/1996


Top of Page