Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Redwood Marine Terminal I-Sniper Enterprises
Private
253052
Vance Avenue SAMOA, CA 95564
30
401-031-071, 401-112-029
40.81187540596971 / -124.19435619329693
2
Byous, Eric
Byous.Eric@epa.gov
415-972-3531


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
R9 TBA - California (STAG Funded)n/aCATBA2004


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$7,584.0003/18/202206/16/2022R9 TBA - California (STAG Funded)YFY22


Is Cleanup Necessary? Unknown
EPA Assessment Funding: $7,584.00
Leveraged Funding:
Total Funding: $7,584.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media



Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented: U
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 30
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

U
U


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

A Phase I Environmental Site Assessment (ESA) was performed for the Samoa - Redwood Marine Terminal 1 and was separated into four individual reports based on parcel ownership. The Sniper Enterprises portion comprises two parcels and an approximately 30-acre portion of a 300-acre former lumber mill located on the Samoa Peninsula in Samoa, Humboldt County, California (Site). At the request of the Humboldt Bay Harbor, Recreation and Conservation District, the draft version of this Phase I ESA report was accepted as the final deliverable without revision. In 1889, the Samoa Land and Improvement Company purchased 270 acres of land on the peninsula opposite of Eureka, California. In 1892, the John Vance Mill and Lumber Company purchased land on the Samoa Peninsula for the construction of a new sawmill after their Eureka, California, mill burned in a fire. In 1893, the Eureka and Klamath River Railroad connected the Samoa Peninsula and Arcata, California, providing a more efficient means of logging imports to the sawmill operations. In 1900, the Hammond Lumber Company acquired the sawmill, adding a sash and door factory in 1909. In 1912, the sawmill was recognized as the "Hammond Lumber Company". Between 1917 and 1919, the Hammond Lumber Company built an emergency shipyard to help with the United States efforts in World War I and seven wooden steam ships were built at the Samoa facility. In 1956, Georgia Pacific acquired the mill, adding a plywood mill in 1958. In 1963, Georgia Pacific developed the bleached kraft pulp mill to the west of the Site and replaced the old sawmill with a modern sawmill in 1964. In 1972, the Louisiana Pacific Corporation acquired the former lumber mill and continued operations until the last old growth timber was milled in 1980. In 1994, the pulp mill to the west of the Site was converted to a chlorine-free pulp mill. The Simpson Timber Company acquired the former lumber mill in 1998 and listed the former lumber mill for sale in 2001. At the time of the Phase I ESA, the Site is currently occupied by a log and peat moss storage facility owned and operated by Sniper Enterprises. Recommendations from the Phase I ESA are listed below.

Recognized Environmental Conditions (RECs):
*Further characterize the gasoline, metals, and solvents contamination in soil, soil gas, and groundwater beyond the perimeter of the Evergreen Pulp Mill Site.
*Collect grab surface soil samples adjacent to the existing Sniper Enterprises aboveground storage tank (AST) for total petroleum hydrocarbons (TPH) analysis.
*Collect surface soil samples within former building foundation and drip line boundaries for lead and asbestos analysis.

Environmental Concerns:
*Collect hazardous building materials samples (asbestos, lead-based paint, and polychlorinated biphenyls [PCBs]) in each existing building on the Site.
*Collect metals and TPH wipe samples within each existing building on the Site.
*Collect sediment samples within each stormwater inlet drain for metals and TPH analysis.


Top of Page