Profile Information

Private
104563
50 State Street Leominster, MA 01420-7266
35
42.5566277 / -71.76941720000002
2
Gardner, Frank
Gardner.Frank@epa.gov
617-918-1278


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Montachusett Regional Planning CommissionBF97116001MAAssessment2004
Montachusett Regional Planning CommissionBF97171101MAAssessment2007


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$2,500.0008/01/200510/31/2005Montachusett Regional Planning CommissionYFY10
Phase II Environmental Assessment$80,500.0006/30/200809/30/2009Montachusett Regional Planning CommissionNFY10


Is Cleanup Necessary? Yes
EPA Assessment Funding: $83,000.00
Leveraged Funding:
Total Funding: $83,000.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Lead
Other Metals
Petroleum Products
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Soil
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 35
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls



Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The Site consists of approximate 4.2 miles of inactive rail corridor, comprising a total land area of approximately 35 acres. Commencing in downtown Leominster, MA in Carter Park, the Site extends in a northwesterly direction towards the downtown area of Fitchburg, MA. The rail corridor is located in close proximity to and runs parallel to MA State Route 12 North Main Street in Leominster and Water Street in Fitchburg. The Site is located in a heavily developed area and bisects or is surrounded by a variety of residential, commercial and industrial districts, as well as areas of open space. The Site comprises approximately 551,750 square feet of land in Fitchburg and approximately 966,000 square feet of land in Leominster. The Site traverses residential, commercial and industrial zoning districts in the two communities. The Fitchburg portion of the Site bisects 124 parcels, while the Leominster portion of the Site bisects approximately 419 parcels.

Former Use: The Site historically was utilized as a railroad corridor prior to the acquisition by CSX however it is currently inactive and the track and ties have been removed. The Site varies from 30 feet to 140 feet in width and was formerly utilized by Conrail for freight service to local manufacturing industries. The majority of the land is overgrown with brush and in general disrepair. The rail line was constructed around 1851 by the New York, New Haven and Hartford Railroad Company. The CSX Rail Corporation acquired the Site from Conrail on June 1, 1999 and incorporated it into the larger CSX network that traverses New England. In April of 2002, CSX proposed to discontinue service of the 4.2 mile portion of rail line and make it available to the Cities for development and use as a pedestrian trail.
Hazardous