Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Government
116405
833 U.S. 2 East Wilton, ME 04294-6649
11
34-139
44.5952775 / -70.2224543
2
Lombard, Christine
Lombard.Chris@epa.gov
617-918-1305


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Androscoggin Valley Council of GovernmentsBF97161801MEAssessment2008
Maine Department of Economic and Community DevelopmentBF96135501MEBCRLF2010
Maine Department of Environmental ProtectionRP96169901MESection 128(a) State/Tribal2012
Maine Department of Environmental ProtectionRP96141801MESection 128(a) State/Tribal2011
Maine Department of Environmental ProtectionRP96136101MESection 128(a) State/Tribal2010
Wilton Town ofBF96161801MECleanup2012


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase II Environmental Assessment$6,223.0003/23/201103/28/2011Maine Department of Environmental ProtectionN
Phase II Environmental Assessment$5,130.0011/01/201112/23/2011Maine Department of Environmental ProtectionN
Phase II Environmental Assessment$18,274.0007/26/201112/23/2011Maine Department of Environmental ProtectionN
Supplemental Assessment$3,196.0003/21/201105/23/2011Maine Department of Environmental ProtectionN


Is Cleanup Necessary? Yes
EPA Assessment Funding: $32,823.00
Leveraged Funding:
Total Funding: $32,823.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Asbestos
Chromium (Cr)
Other Metals
Petroleum Products
VOCs
Cleaned Up
Cleaned Up
Cleaned Up
Cleaned Up
Cleaned Up
Building Materials
Soil
Cleaned Up
Cleaned Up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
03/21/2011$12,908.00Maine Department of Environmental ProtectionNo
07/21/2014$200,000.0006/24/2015Wilton Town of


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 11
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding: $212,908.00
Leveraged Funding:
Cost Share Funding:
Total Funding: $212,908.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

Yes
Government Controls Information Devices
Prohibition of the extraction of groundwater and future site excavation needs to be completed in accordance with the soil management plan completed and submitted as part of the Maine DEP VRAP.
Yes
07/13/2015
Yes
Cover Technologies (e.g., Capping) Immobilization Process (e.g., Encapsulation, In-Situ Solidification)
Any reuse of the existing slab may require capping or encapsulation to prevent intrusion from PCE releases inside the building
Yes
06/24/2015


Top of Page


Redevelopment and Other Leveraged Accomplishments

Start DateLeveraged FundingCACompletion Date
08/03/2015$10,000.00Wilton Town of


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

As a result of this assessment the Maine DEP funded the collection and removal of all hazardous waste being stored in the building. DEP also funded testing for asbestos and PCB?s in the construction materials in the building and the consultant has prepared a VRAP application to the MEDEP. In an effort to complete the assessment and clean-up of this site DEP is also funding a Phase I & II Assessment for the remainder of the tannery property adjacent to the area assessed by this grant. The town has been approached by a number of businesses interested in this property, including a local landscape business, and a local diversified wood products business. Given it?s highly visible location on a major travel corridor, redevelopment of the property is likely when the assessment and Cleanup are complete.

Former Use: Former tannery printing activities and storage are the most recent.
Industry (11)
Hazardous
Enrolled: 10/07/2011
06/24/2015


Top of Page