Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Government
116541
2.1 miles South of Keller, 85 feet West of Highway 21 Keller, WA 99140
.01
48.04098803666605 / -118.66963409311529
5
Labaw, Joanne
Labaw.Joanne@epa.gov
206-553-2594


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Confederated Tribes of the Colville ReservationRP96082701WASection 128(a) State/Tribal2008


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Cleanup Planning$5,754.0011/01/200912/09/2009Confederated Tribes of the Colville ReservationYFY18


Is Cleanup Necessary? No
EPA Assessment Funding: $5,754.00
Leveraged Funding:
Total Funding: $5,754.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media



Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .01
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

No
No
Yes
Other SSD system is in place
Tanks were cut open, cleaned with absorbent pellets and rags, and transported for recycling. Product and vent piping was removed and transported for recycling. Approximately 10 gallons of water emptied from 200 gall UST was transported for disposal. Soil was re-used at the site.
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The Keller Park site is located about 2.1 miles south of Keller, WA. The USTs (three total) reportedly were associated with a service station that previously occupied the site; currently no structure remain at the site. No information was available regarding the UST's at the site. The UST's were decommissioned and seven samples were conducted. The samples indicated diesel/petroleum levels present but not above MTCA and HSCA cleanup levels.

Former Use: DESCRIPTION: 2.1 miles South of Keller, Washington. Located in a stand of pine trees approximately 85 feet West of Highway 21. A gravel road and an open grassy area were located directly East of the USTs and three vent pipes for the USTs were present between the tanks and the pine tree. HISTORY: Associated with a service station that previously occupied the site. No current structures remain at the site.
Petroleum
12/09/2009


Top of Page