118021
W Bank of Kuskokwim River Akiak, AK 99552
1.08
60.892194 / -161.225
1
Morales, Susan
Morales.Susan@epa.gov
206-553-7299


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Alaska Department of Environmental ConservationRP97055607AKSection 128(a) State/Tribal2009


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$11,404.0008/26/200904/22/2010Alaska Department of Environmental ConservationYFY10


Is Cleanup Necessary? Yes
EPA Assessment Funding: $11,404.00
Leveraged Funding:
Total Funding: $11,404.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Unknown
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 1.08
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

No
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The site investigation indicated the following potential sources of the contamination on the property: two aboveground storage tanks associated with the former tank farm approximately 70 5-gallon buckets stored inside the old power plant building suspected contents are motor oil three generators two inside the old power plant building and one outside in the brush several transformers at the Site and lead-acid batteries. The consultant estimates approximately 70 cubic yards of petroleum hydrocarbon-impacted soil are present at the site.

Former Use: The former power plan building, which remains on the Site, is approximately 25 feet by 30 feet in size and was built in the late 1970s. The building was impacted by flooding in the spring of 2009 and the high water mark was approximately 2 feet above the floor of the building, which is elevated on pilings. The floor is heavily stained. Before the power plant was built, the Site was undeveloped and used for subsistence high bush cranberry picking in the fall. The Site has been unused since the new tank farm and power plant were built around 2000. The Site is owned by the City of Akiak.