Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

118221
48 16' 51.60 Sandpoint, ID 83864
2
RPS37110000021A
48.2690475 / -116.5477675
1
Griffith, Terri
Griffith.Terri@epa.gov
206-553-8511


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Idaho Department of Environmental Quality2B00J03401IDAssessment2009


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$8,663.0012/01/201009/30/2011Idaho Department of Environmental QualityYFY16


Is Cleanup Necessary? Unknown
EPA Assessment Funding: $8,663.00
Leveraged Funding:
Total Funding: $8,663.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media



Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 2
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls



Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Former Use: POBT Zone 1, Humbird Mill Landing Site Replat, Lot 2 less Tax 1, City of Sandpoint property requires a petroleum assessment based on its historical industrial usage. Lot 2 less Tax 1 was part of the Humbird Mill formed in 1900 when John A. Humbird and Frederick Weyerhaeuser purchased the 2-year-old Sandpoint Lumber Co. adjacent to the Northern Pacific Rail Line. The Humbird Mill site covered a large area between Sand Creek and Lake Pend Oreille. The plant contained a saw mill, lath mill, planing mill, car house and machine shop, dry kilns, loading sheds, dressed lumber shed, lumber yards, transfer shipping sheds, 90-foot-tall refuse burner, 100,000-gallon water tank, laydown areas, storage buildings, blacksmith facilities and, in later days, a club room for employees Sanborn map, 1921. The blacksmith shop and powerhouse for water supply were built on land that formerly served as the early Sandpoint cemetery. The plant layout was functionally divided by the Northern Pacific tracks. The sawmill fronted Lake Pend Oreille on the east side of the tracks. A conveyor ran under the tracks to the west side and the planing facilities. The conveyor included an oil room located at Lot 2 less Tax 1. Humbird Mill liquidated its operations in 1931, succumbing to the Great Depression. The Humbird Mill was torn down and parcel Lot2 less Tax 1 ownership reverted back to the Northern Pacific Rail Line. In 2005, the City of Sandpoint negotiated purchase of Lot 2 less Tax 1, from BNSF Railway for future expansion of the City�s Water Treatment Plant.
Industry (2)
Hazardous
Enrolled: 12/01/2010


Top of Page