Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Government
121303
180 East Main Street Tilton, NH 03276
.8
Map U-04 Lot 71
43.4448511 / -71.5830134
1
Lombard, Christine
Lombard.Chris@epa.gov
617-918-1305


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Capital Regional Development CouncilBF96145801NHBCRLF2011
Lakes Region Planning CommissionBF96111801NHAssessment2009
Tilton, Town of BF96162501NHCleanup2012


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Cleanup Planning$9,002.0011/01/201106/13/2013Lakes Region Planning CommissionN
Phase I Environmental Assessment$5,243.0008/20/201011/02/2010Lakes Region Planning CommissionYFY11
Phase II Environmental Assessment$32,912.0011/03/201004/15/2011Lakes Region Planning CommissionN
Supplemental Assessment$11,849.0006/21/201110/03/2012Lakes Region Planning CommissionN


Is Cleanup Necessary? Yes
EPA Assessment Funding: $59,006.00
Leveraged Funding:
Total Funding: $59,006.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Arsenic
Asbestos
Lead
Other Metals
PAHS
PCBS
Petroleum Products
Cleaned Up
Cleaned Up
Cleaned Up
Cleaned Up
NOT Cleaned up
Cleaned Up
Cleaned Up
Building Materials
Ground Water
Soil
Cleaned Up
Cleaned Up
Cleaned Up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
11/01/2012$200,000.0006/23/2016Tilton, Town of No
11/01/201206/23/2016Tilton, Town of No
11/01/201206/23/2016Tilton, Town of No
11/01/201206/23/2016Tilton, Town of No
11/01/201206/23/2016Tilton, Town of No
11/01/201206/23/2016Tilton, Town of No
10/27/2014$53,700.0006/23/2016Capital Regional Development Council


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .8
Number of Cleanup Jobs Leveraged: 18
EPA Cleanup Funding: $253,700.00
Leveraged Funding: $86,223.00
Cost Share Funding: $40,000.00
Total Funding: $379,923.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

No
No
Yes
Cover Technologies (e.g., Capping)
Non-regulated concentrations of PAHs and metals are present at the Site but represent human health risks. The risks will be mitigated by the installation of a marker , clean soil cover system, and vegetation.
Yes
06/23/2016


Top of Page


Redevelopment and Other Leveraged Accomplishments

Start DateLeveraged FundingCACompletion Date
07/01/2014$5,368.00Tilton, Town of 06/23/2016
07/01/2014$4,500.00Tilton, Town of 06/23/2016
07/01/2014$8,125.00Tilton, Town of 06/23/2016
01/31/2011$537,951.00Lakes Region Planning Commission
01/31/2011$65,000.00Lakes Region Planning Commission
01/31/2011$1,500.00Lakes Region Planning Commission


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The subject property is comprised of one 0.8-acre parcel of land located at 180 East Main Street in Tilton, New Hampshire at the intersection of East Main Street and Copeland Road. The subject property located adjacent to the Winnipesaukee River. The subject property is currently occupied by a garage and a cottage. Both buildings are currently vacant and in severe disrepair. Both buildings were constructed prior to 1951, but the exact dates are not known. The garage has a footprint of approximately 2,200 sqaure feet and the cottage has a footprint of approximately 500 square feet. The property is referred to by the Town of Tilton as Map U-04, Lot 71 and is currently owned by the Anthony Turchin Estate. Although exact dates were not determined, the subject property was formerly operated as gas station from approximately 1939 until the 1970s. An automobile body shop, used automobile repair shop, automobile salvage yard, used automotive sales, and Uhaul truck rental businesses have also occupied the subject property. The property is zoned Mixed Use MU. The remaining developed portions of the property are occupied by paved and gravel parking areas, overgrown lawn area, and vegetated area along the eastern and southern property lines. The subject property is bound to the east by a residential property, to the south by the Winnipesaukee River, to the west by a vacant gravel lot, and to the north by the Tilton Police Department. One 1 heating oil above ground storage tank AST was observed outside on the south side of the garage building. According to records, three 3 1000-gallon gasoline underground storage tanks USTs and one 1000-gallon waste oil UST were removed from the subject property in 1993. Potable water is provided to the subject property by the Tilton-Northfield Water District. The water service is located between East Main Street and the north side of the buildings. According to representatives of the Tilton-Northfield Water District, all properties in the vicinity of the subject property are served by the public water supply. The closest drinking water supply well was not located. However, due to the location of the subject property adjacent to the Winnipesaukee River, it is unlikely that contamination on the subject property would have affected the environmental conditions of nearby wells. Wastewater from the subject property is currently discharged to the municipal sewer system located between East Main Street and the north side of the buildings. The subject property was connected to the municipal sewer system in 1983. Prior to connection, the subject property likely discharged wastewater to an on-site septic system or directly to the Winnipesaukee River. Electricity was formerly provided to the property via overhead lines from Public Services of New Hampshire. The utility lines to the garage have been cut. Heat is provided to the property by a forced hot air heating system with a fuel oil fired furnace located in the garage. It appears that heat was provided to the cottage via ducts from the same furnace

Former Use: The subject property is currently occupied by a garage and a cottage. Both buildings are currently vacant and in severe disrepair. Both buildings were constructed prior to 1951, but the exact dates are not known. Although exact dates were not determined, the subject property was formerly operated as gas station from approximately 1939 until the 1970s. An automobile body shop, used automobile repair shop, automobile salvage yard, used automotive sales, and Uhaul truck rental businesses have also occupied the subject property. The property is zoned Mixed Use MU.
Commercial (.8)
Petroleum
ID Number (if Applicable): 199311019 Enrolled: 08/16/1993
06/23/2016


Top of Page