Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Private
129583
2200 Lake Shore Drive East Ashland, WI 54806
28.72
201-03611-0000
46.603786 / -90.856269
7
Miller, Robert
bmiller@coawi.org
715-682-7002


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Ashland, City of (Wisconsin)BF00E62901WIAssessment2008
Wisconsin Department of Natural ResourcesBF00E01203WIAssessment2013


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$3,660.0011/01/201004/01/2011Ashland, City of (Wisconsin)YFY11
Phase II Environmental Assessment$16,571.0010/26/201106/01/2012Ashland, City of (Wisconsin)N
Supplemental Assessment$34,502.0005/06/201612/30/2016Wisconsin Department of Natural ResourcesN


Is Cleanup Necessary? Unknown
EPA Assessment Funding: $54,733.00
Leveraged Funding:
Total Funding: $54,733.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Other Metals
PAHS
NOT Cleaned up
NOT Cleaned up
Soil
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 28.72
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

Yes
Information Devices
The property is listed on the WDNR GIS Registry database, and as an Engineering Control and an Institutional Control site. These listings are related to remaining arsenic and chromium soil contamination associated with former wood treatment processes that occurred prior to ownership by Timeless Timber. The soil contamination was remediated to the extent possible, and then capped with asphalt. A deed restriction is in place for the remaining soil contamination.
http://dnr.wi.gov/botw/GetActivityDetail.do
Yes
11/22/2000
Yes
Cover Technologies (e.g., Capping)
The property is listed on the WDNR GIS Registry database, and as an Engineering Control and an Institutional Control site. These listings are related to remaining arsenic and chromium soil contamination associated with former wood treatment processes that occurred prior to ownership by Timeless Timber. The soil contamination was remediated to the extent possible, and then capped with asphalt. A deed restriction is in place for the remaining soil contamination.
http://dnr.wi.gov/botw/GetActivityDetail.do
Yes
11/22/2000


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Former Use: The property lies within portions of Sections 27 and 34, Township 48 North, Range 4 West in the City of Ashland, Ashland County, Wisconsin, and is located on the south side of Lake Shore Drive East between 22nd Avenue East and 24th Avenue undeveloped right-of-way. It is approximately 28.72 acres in size. The property is currently owned by Timeless Timber, Inc. and is used for the processing of salvaged timbers into various commercial goods. Activities at the property include lumber storage and retail sales, wood drying and planing, wood finishing and a gift shop. Five structures are present on the property and include an office/lumber retail/gift shop building, two large warehouse additions, a dry kiln building, and the former Lake Shore School building. Additionally, a sixth structure, the former East Bay, was demolished sometime between 2000 and 2002. The property was originally developed for residential purposes in the late 1800�s. The northeast corner of the property contains a former school house that was in use until approximately 1956. The property has been used for various industrial/commercial purposes since at least 1965. The property was owned by the Board of Education sometime from the early 1900�s to 1965, at which time it was deeded to the City of Ashland, and then immediately to the Beloit Hibob Corporation. This company used the property for the manufacture of wood hauling equipment until 1973. In 1973 the property was purchased by Continental Forest Products and produced wood treated products. The property was then leased in 1978 by the Louisiana-Pacific Corporation and built a saw mill that produced lumber products including treated wood. The saw mill remained in operation until 1988. In 1996, the property was occupied by Explorations International, which later changed its name to Timeless Timber, Inc.
Commercial (28.72)
Hazardous


Top of Page