Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Government
135483
Bugbee Road Robbinston, ME 04671
417
Book 2127, Page 47 (Map 7 Lot 40)
45.03311881846721 / -67.21022786264234
2
user, Delete
dalem@wabanaki.com
207 853-2600


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Passamaquoddy TribeBF96176101MEAssessment2013
Passamaquoddy Tribe Pleasant PointBF96111901MEAssessment2009
Passamaquoddy Tribe Pleasant PointRP96152501MESection 128(a) State/Tribal2011
Passamaquoddy Tribe Pleasant PointRP96135601MESection 128(a) State/Tribal2010
Pleasant Point Indian ReservationRP96189401MESection 128(a) State/Tribal2014


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase II Environmental Assessment$4,394.0003/15/2012Passamaquoddy Tribe Pleasant PointN
Phase II Environmental Assessment$31,524.0001/16/201404/29/2015Passamaquoddy TribeYFY17


Is Cleanup Necessary? No
EPA Assessment Funding: $35,918.00
Leveraged Funding:
Total Funding: $35,918.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Lead
Other Contaminants
Petroleum Products
Cleaned Up
Cleaned Up
Cleaned Up
Building Materials
Soil
Cleaned Up
Cleaned Up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
05/12/2015$2,560.0011/09/2015Pleasant Point Indian Reservation


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 417
Number of Cleanup Jobs Leveraged: 5
EPA Cleanup Funding: $2,560.00
Leveraged Funding:
Cost Share Funding:
Total Funding: $2,560.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

No
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The Tribe purchased this property for the enrichment of Tribal Youth and is dedicated to maintaining this vision. Ideally the Site will be utilized by tribal youth for cultural and recreational activities including but camping, hunting, and fishing.

Former Use: The Site consists of a remote campsite located on the southeastern shore of Upper Penknife lake. The property was previously occupied by a single-story wood d cabin and separate outhouse. Both structures were reportedly constructed in the late 1980�s or early 1990�s and lacked fixed plumbing or any other utilities. The site was last occupied prior to 2007 by an unauthorized tenant and approximately 50 cats. The tenant maintained a primitive lifestyle and inhabited the cabin for a period of three to four years. He did not use electricity or running water and heat was provided by several portable kerosene space heaters. His occupancy resulted in the collection of significant debris and solid waste inside the cabin, including miscellaneous plastic containers, pails, and more than 50 plastic shopping bags suspected to contain feline and human fecal matter. Both structures and all associated debris were removed from the Site as part of the Phase II ESA.
Greenspace (416) Residential (1)
Hazardous
Enrolled: 10/19/2015
11/09/2015


Top of Page