Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Private
157024
Swan Lake Avenue Belfast, ME 04915
3.1
Tax Map 23, Lots 9A & 12
44.4988132 / -69.00682169999999
2
McKeown, Amy
McKeown.AmyJean@epa.gov
617-918-1248


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Belfast City ofBF96175501MEAssessment2013
Belfast, City of BF96151001MEAssessment2011


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$2,636.0006/04/201207/10/2012Belfast, City of NFY14
Phase II Environmental Assessment$18,189.0007/10/201211/06/2013Belfast, City of YFY14
Phase II Environmental Assessment$830.0010/01/201311/06/2013Belfast City ofN


Is Cleanup Necessary? Unknown
EPA Assessment Funding: $21,655.00
Leveraged Funding:
Total Funding: $21,655.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Petroleum Products
Arsenic
Asbestos
Lead
Other Contaminants
Other Metals
PAHS
SVOCs
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Petroleum Products
Building Materials
Ground Water
Soil
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 3.1
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

Yes
Information Devices
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Former Use: The encompassess approximately 3.1 acreas and was originally developed circa 1895 as the Upper Mill of the Sherman & Company Leather board Factory. Mason Dam was constructed at that time and utilized for hydroelectric power generation for the factory until a majority of former Site buildings were destroyed by a fire that occurred at the Site in 1944. The Site was then utilized solely for hydroelectric power generation until 2009 and has remained vacant to the present date. The Site is currently improved with one building (the �Turbine House�), which contains two turbines and generators that were formerly utilized for hydroelectric power generation. The Site is also improved with a crushed gravel driveway/parking area, a dug-channel tail race, and a snowmobile/ATV trail and wooden bridge. Remaining portions of the Site consist of undeveloped wooded land and/or overgrown vegetated land. The Site is currently serviced with electricity and municipal water is available to the Site.
Hazardous


Top of Page