Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Government
163364
146 Emery St. Westfield, MA 01085
3
42.128025 / -72.747786
1
Lombard, Christine
Lombard.Chris@epa.gov
617-918-1305


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Pioneer Valley Planning CommissionBF96164201MAAssessment2012


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$67,996.0006/03/201303/11/2014Pioneer Valley Planning CommissionYFY16
Phase I Environmental Assessment$3,520.0006/03/201303/11/2014Pioneer Valley Planning CommissionYFY16


Is Cleanup Necessary? Unknown
EPA Assessment Funding: $71,516.00
Leveraged Funding:
Total Funding: $71,516.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Arsenic
Other Metals
PAHS
Petroleum Products
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Ground Water
Soil
NOT Cleaned up
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 3
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

None current. Depends on eventual reuse.


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Based on information obtained during TRC�s 2013 Phase I ESA, historical Site ownership and operation (as well as adjoining properties) consisted mainly of industrial use. The 0 Emery Street parcel was historically operated as a power generation house for railroad services (c. 1900 through 1944) and sub-station/transformer yard from c. 1944 through 1974. The parcel identified as 146 Emery Street (aka 30 Emery Street) was historically operated as a grinding wheel manufacturing facility from c. 1905 through the late 1980s. Historical uses of the 362 Elm Street parcel included manufacturing and woodworking prior to 1889 through c. 1994.

Former Use: This site occupies a key location on the Westfield River waterfront in downtown Westfield. The site occupies parts of four parcels: 0 Emery Street, 146 Emery Street, 362 Elm Street, and Parcel X-X along the immediate riverfront. The area has a long industrial history. Much of the site was formerly occupied by the Waltham Grinding facility, which manufactured grinding wheels. Other portions of the site have been occupied by a railroad, an electrical powerhouse, and a manufactured gas plant. All structures on the site have been demolished and all properties are currently vacant. The City of Westfield has acquired ownership of the parcels through various means since the 1970s. Projected re-uses of the area as of 2014 include mixed residential/commercial and extension of a nearby bikeway along the immediate riverfront and possible the former railroad right of way.
Industry (3)
Hazardous & Petroleum
ID Number (if Applicable): 1-237 Enrolled: 01/15/1987


Top of Page