170601
301 Lakeside Avenue Lorain , OH 44052
6.34
41.4730613 / -82.17416580000002
5
Stimple, Bradley
stimple.brad@epa.gov
440-250-1717


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Lorain Port Authority BF00E01060OHAssessment2012


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase II Environmental Assessment$54,977.0006/21/201310/01/2013Lorain Port Authority YFY15


Is Cleanup Necessary? No
EPA Assessment Funding: $54,977.00
Leveraged Funding:
Total Funding: $54,977.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Petroleum Products
Arsenic
Cadmium (Cd)
Chromium (Cr)
Lead
Mercury
Nickel (Ni)
Other Metals
SVOCs
VOCs
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Petroleum Products
Soil
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 6.34
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls



Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The Lorain CDF was constructed in 1977 and is constructed from rubble mound and steel sheet pile. The entire CDF covers approximately 58 acres and has a total sediment capacity of 1,850,000 cubic yards. The CDF is a peninsula jetting into Lake Erie and is generally flat. The dredge material placed into the CDF is dewatered by seepage through the dike walls and by discharge through an overflow weir into Lake Erie. Treatment of the effluent is achieved through settling and filtration through the dike wall. Groundwater was not encountered during the Limited Phase II investigation, but based on the construction of the CDF, Lake Erie and groundwater under the CDF are in communication, so groundwater at the Property likely flows to the north and west, towards Lake Erie.

Former Use: Former man-made dike filled with dredge sediment.
Petroleum