Profile Information

Private
211521
503 East Front Street MISSOULA, MT 59802
.32
46.8688519 / -113.989315
1
Shen, Stephanie
shen.stephanie@epa.gov
303-312-6184


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Missoula, City ofBF97810201MTBCRLF1999
Montana Department of Environmental Quality RP98881114MTSection 128(a) State/Tribal2013
R8 TBA - Montana (STAG Funded)n/aMTTBA2004


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Cleanup Planning$2,500.0009/24/201501/21/2016R8 TBA - Montana (STAG Funded)N
Phase II Environmental Assessment$12,000.0009/24/201501/21/2016R8 TBA - Montana (STAG Funded)YFY16


Is Cleanup Necessary? Yes
EPA Assessment Funding: $14,500.00
Leveraged Funding:
Total Funding: $14,500.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Asbestos
Lead
Mercury
Other Contaminants
Other Metals
Cleaned Up
Cleaned Up
Cleaned Up
Cleaned Up
Cleaned Up
Building Materials
Soil
Cleaned Up
Cleaned Up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
04/10/2016$79,171.0012/28/2017Missoula, City ofYes
07/13/2016$51,526.7701/10/2019Montana Department of Environmental Quality No


Cleanup/Treatment Implemented: Y
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .32
Number of Cleanup Jobs Leveraged: 1
EPA Cleanup Funding: $130,697.77
Leveraged Funding:
Cost Share Funding:
Total Funding: $130,697.77


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

No
No
No
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

Start DateLeveraged FundingCACompletion Date
12/28/2017$305,000.00Missoula, City of01/24/2019
12/28/2017$1,614,000.00Missoula, City of01/24/2019
12/28/2017$81,000.00Missoula, City of01/24/2019


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The original log cabin was built on-site in, or before, approximately 1882. Over time additions and buildings were added to the property. Between 1902 and 1912 the buildings were joined together by siding. The site was operated as rental property. In early 2015, the owner received a notice from the city outlining several items that deemed the property uninhabitable. The property has been vacant since January 2015 and was later proposed to be demolished. Asbestos-containing material (ACM), lead-based paint (LBP), and lead in soils were identified at the site. In 2016, the North Missoula Development Corporation proposed to build seven affordable townhouses in a complex called Lee Gordon Place after demolition and was permitted to do so by the Missoula Redevelopment Agency. In 2019, construction was completed for the Lee Gordon Place which included four two-bedroom units, two four-bedroom units, and one fully handicapped accessible two-bedroom unit. The estimated sale prices of these units was $148,000, $175,000, and $135,000, respectively.

Former Use: The property was donated to the North Missoula Development Corporation. DEQ was responsible for the excavation of soils exceeding residential direct contact screening levels.
Residential (.32)
Enrolled: 07/14/2017
01/10/2019