Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

233 Odlin Road
Government
212801
233 Odlin Road BANGOR, ME 04401
19
001-001
44.7922131 / -68.8099672
2
McKeown, Amy
McKeown.AmyJean@epa.gov
617-918-1248


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Bangor, City ofBF96188601MEAssessment2014


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Cleanup Planning$4,000.0001/25/201702/10/2017Bangor, City ofN
Phase I Environmental Assessment$4,843.0003/24/201607/08/2016Bangor, City ofYFY17
Phase II Environmental Assessment$37,946.0007/12/201601/17/2017Bangor, City ofN
Phase II Environmental Assessment$2,509.0007/12/201601/17/2017Bangor, City ofN
Phase II Environmental Assessment07/12/201601/17/2017Bangor, City ofN
Supplemental Assessment08/01/2018Bangor, City ofN


Is Cleanup Necessary? Yes
EPA Assessment Funding: $49,298.00
Leveraged Funding: $1,334,794.00
Total Funding: $1,384,092.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Lead
Other Metals
PAHS
SVOCs
VOCs
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Soil
NOT Cleaned up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
10/01/2016Bangor, City ofNo


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 19
Number of Cleanup Jobs Leveraged: 0
EPA Cleanup Funding:
Leveraged Funding: $1,186.00
Cost Share Funding:
Total Funding: $1,186.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

Yes
Information Devices
No
Yes
Cover Technologies (e.g., Capping)
Cover systems will be employed to limit direct contact with PAHs
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

Start DateLeveraged FundingCACompletion Date
09/01/2020$4,700.00Bangor, City of


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Formerly part of Dow Air Force Base. The Site was used as a salvage yard accepting scrap and other materials for recycling/disposal.

Former Use: The approximately 19-acre Site comprises two undeveloped parcels. The Site is generally cleared with a small wooded area in the western portion of the Site. A degraded paved driveway associated with a former building is located across the central portion of the Site and connects to the unnamed access road along the northern edge of the Site. The larger of the two parcels is a portion of BIA with an address of 1 BIA; however, for purposes of assessment, the two parcels are referred to as 233 Odlin Road to exclude the remainder of the airport. In the early days of the Godfrey Airfield (1920s and 1930s) the Site was located in the undeveloped outskirts of the airport and was possibly used for farming. The Site was developed with one building as a satellite salvage yard associated with the DOW Army Airfield by 1942, later the Dow Air Force Base (AFB) by 1947. By 1947, Site operation had expanded and buildings consisted of three large buildings known as T-133, T-134, and T-161, several smaller buildings known as T-162, T-163, and T-164, and several shed size buildings. The salvage yard operated at the Site through 1968 when the Dow AFB closed. During its operation the salvage yard accepted scrap metal, aircraft and auto parts, automobiles, paints, paint thinner, clothing and office furniture and supplies. Larger materials were stored on the open ground surface. By 1973, only one main building remained. After closure of the AFB, the Site was transferred to the City of Bangor, whom leased the Site to a plumbing and heating supply company and later a cabinet maker. By 2004, the former Site building was removed and the Site has remained undeveloped and unused since that time.
Industry (19)
Hazardous


Top of Page