500 E. Packard Highway CHARLOTTE, MI 48813
102
200-007-100-012-00
42.5821959 / -84.8271329
7
Spencer, Diane
Spencer.Diane@epa.gov
312-886-5867


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
City of Lansing Brownfield Redevelopment AuthorityBF00E01544MIAssessment2015


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$3,500.0004/29/201606/03/2016City of Lansing Brownfield Redevelopment AuthorityYFY18
Phase II Environmental Assessment06/13/201601/23/2017City of Lansing Brownfield Redevelopment AuthorityN
Phase II Environmental Assessment$32,040.0006/13/201601/23/2017City of Lansing Brownfield Redevelopment AuthorityN


Is Cleanup Necessary? Yes
EPA Assessment Funding: $35,540.00
Leveraged Funding: $3,560.00
Total Funding: $39,100.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Arsenic
Cadmium (Cd)
Copper (Cu)
Lead
Other Metals
Selenium (Se)
VOCs
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Ground Water
Soil
NOT Cleaned up
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 102
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

No
Yes
Cover Technologies (e.g., Capping)
capping and other continuing obligations required during future redevelopment and reuse


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The Property was developed as the Owens-Illinois Charlotte (also known as Owens-Brockway Glass) glass manufacturing plant circa 1962, and included two glass furnaces. The current plan for a portion of the Property consists of a liquid and dry fertilizer storage and distribution operation. A 45,000-square foot storage facility will be constructed on the northeastern portion of the Property adjacent to the existing rail spur. Approximately 2.5 million gallons of liquid fertilizer will be stored at this facility. Planning is underway for the future use of the existing glass factory and remaining portions of the Property. More investment and jobs are planned for the future use.

Former Use: The Property was developed as the Owens-Illinois Charlotte (also known as Owens-Brockway Glass) glass manufacturing plant circa 1962, and included two glass furnaces. Various upgrades were integrated between 1962 and 1978, including an additional glass manufacturing furnace and associated equipment. This operation continued until 2010, at which point the plant ceased operation and much of its equipment was removed. Prior to its use for glass manufacturing, the Property included a residence at its eastern end, near the intersection of Packard Highway and the rail line. The remainder of the Property was utilized for agricultural purposes, prior to the construction of the manufacturing plant.
Industry (102)
Hazardous


Top of Page