Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

227261
511 W. Live Oak Street MIAMI, AZ 85539
.05
206-19-073
33.3984228 / -110.8704645
2
Garcia, Jose
Garcia.Jose@epa.gov
213-244-1811


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Industrial Development Authority of Gila CountyBF99T46001AZAssessment2016


Top of Page


Assessment Activities at this Property

There are no current assessment activities.


Is Cleanup Necessary?
EPA Assessment Funding:
Leveraged Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Building Materials
Air
Soil
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .05
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls



Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Former Use: The Property is situated on approximately 0.05 acres and contained one approximately 3,219-square-foot, two-story building. The building covered almost the entirety of the parcel; however, there was a small dirt lot in the rear of the building. The building was constructed of wood. The exterior walls were covered with textured, painted stucco. The interior walls were covered with drywall and finished with textured, painted stucco. There were wooden floors and pressed tin ceilings. The Property was vacant and unoccupied at the time of the site reconnaissance. The first story of the building was last used for retail purposes. A storage closest located at the southern portion of the building appeared to have an unmarked 5-gallon bucket along with other miscellaneous items. Allwyn observed an additional 5-gallon bucket which contained paint at the bottom of the stairs leading to the second story. The second story appeared to last be used for residential purposes. An entrance at the southern part of the building provided access to the residence. The residence appeared to have past water damage due to the ceiling caving in and what appeared to be mold was observed in the building. At the time of the site reconnaissance, Allwyn did not observe RECs or indicators of RECs on the Property. The Property vicinity was likely developed in the 1870s when the mineral region that encompasses Miami, Claypool, and Globe was removed from the San Carlos Apache Reservation and designated as public land designated as the Globe Mining District. A two-story building was constructed on the Property sometime prior to 1915, and was used as a residence, cement storage, and sash and door manufacturer. The structure was apparently demolished in about 1916, and another structure was constructed between 1922 and 1948. Uses of the structure included lumber storage and retail sales.
Commercial (.05)
Hazardous


Top of Page