Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Private
237501
113-115 Center Street BANGOR, ME 04401
.28
040-102, 040-103
44.8074575 / -68.7712034
2
McKeown, Amy
McKeown.AmyJean@epa.gov
617-918-1248


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Bangor City ofBF00A00450MEAssessment2017
Bangor, City ofBF96188601MEAssessment2014


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$3,379.0007/30/201810/19/2018Bangor, City ofYFY19
Phase I Environmental Assessment$162.2307/30/201810/19/2018Bangor City ofN
Phase II Environmental Assessment$565.0010/19/2018Bangor, City ofN
Phase II Environmental Assessment$2,046.9510/19/201805/21/2019Bangor City ofN
Phase II Environmental Assessment$17,000.0010/19/201805/21/2019Bangor City ofN
Supplemental Assessment$41,028.5905/01/201910/11/2019Bangor City ofN


Is Cleanup Necessary? Yes
EPA Assessment Funding: $64,181.77
Leveraged Funding:
Total Funding: $64,181.77


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Asbestos
Lead
NOT Cleaned up
NOT Cleaned up
Building Materials
Soil
NOT Cleaned up
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .28
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls



Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Former Use: The Site is comprises two parcels (113 and 115 Center Street) totaling approximately 0.28 acres with each parcel covers 0.14 acres. 113 Center Street is improved with one three-story multi-family residential building (aka, south Site building) with five units and is approximately 3,150 square feet. 115 Center Street is improved with one three-story multi-family residential building (aka, north Site building) with three units and is approximately 3,200 square feet. All units at each Site building are currently occupied by residents, and each resident has an assigned staff member from VOANNE. For both Site buildings, the basement and attic spaces are unoccupied by residents. Both Site buildings were constructed circa 1900. According to the tax card, both Site buildings were constructed in 1900. Based on review of the available Sanborns, two buildings were constructed on the Site by 1895. By 1895, two residential buildings were constructed on the two Site parcels with stables constructed in the eastern portion of each respective Site parcel. The surrounding area primarily comprises residential apartments from the earliest record reviewed (1889 Sanborn Map) to present day. Some commercial/light industrial business operated in the area west of the Site, including trucking companies from at least 1895 to 1908, as well as auto sales and service and a motor freight station from at least 1949 to 1987. By 1914, approximately half of the surrounding buildings were demolished, and the Site buildings were modified to the current construction layout. In addition, a livery was constructed onsite east of the south Site building in place of the stable. By 1949, the onsite north stable was replaced with an auto garage, and the livery was removed. By 2004, the auto garage east of the north Site building was removed, and Site conditions and the surrounding area use remained similar to present day.
Residential (.28)
Hazardous


Top of Page