Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Private
244134
303 Water Street LOGANSPORT, IN 46947
17.41
09-17-56-100-001.000- 010
40.760889998991445 / -86.37627003080038
4
Stone, George
Stone.George@epa.gov
312-886-7517


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
City of LogansportBF00E02875INAssessment2020
City of LogansportBF00E03545INAssessment2023
City of LogansportBF00E02313INAssessment2017
Indiana Finance Authority4B00E03232INBCRLF2022


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Cleanup Planning$18,155.6503/01/2022City of Logansport
Cleanup Planning$18,155.6503/01/2022City of Logansport
Cleanup Planning$2,086.0012/12/2023City of Logansport
Cleanup Planning$2,086.0012/12/2023City of Logansport
Phase I Environmental Assessment$4,000.0009/01/202009/29/2020City of LogansportYFY21
Phase I Environmental Assessment$4,000.0009/01/202009/29/2020City of LogansportYFY21
Phase I Environmental Assessment$3,800.0012/16/202212/28/2022City of Logansport
Phase I Environmental Assessment$3,800.0012/16/202212/28/2022City of Logansport
Phase II Environmental Assessment$60,400.0011/18/202012/09/2020City of LogansportN
Phase II Environmental Assessment$60,400.0011/18/202012/09/2020City of LogansportN
Supplemental Assessment$36,979.0009/01/202211/08/2022City of Logansport
Supplemental Assessment$41,097.0103/30/202208/12/2022City of Logansport
Supplemental Assessment$36,979.0009/01/202211/08/2022City of Logansport
Supplemental Assessment$41,097.0103/30/202208/12/2022City of Logansport
Supplemental Assessment$34,231.3412/12/2023City of Logansport
Supplemental Assessment$34,231.3412/12/2023City of Logansport


Is Cleanup Necessary? Yes
EPA Assessment Funding: $401,498.00
Leveraged Funding:
Total Funding: $401,498.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

Selected Strategy(ies)Explanatory Text
Climate-focused Phase I and Phase II ESAsClimate-focused Phase 1 ESAs may consider current and on-going climate change impacts and consider future impacts to the site or area. For example, an investigation of the site history can include an investigation of site vulnerabilities based on historical and recent climate patterns and events (e.g., floods and drought). Climate-focused Phase 2 ESAs may include use of renewable energy, incorporating remote sensing capabilities, maximize reuse of existing wells (as appropriate) and/or design wells for future reuse, use of field test kits when possible, use of local laboratories when possible, and use of appropriate sized equipment for the project."


Top of Page


Contaminants and Media


Arsenic
Lead
Other Metals
VOCs
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Ground Water
Soil
NOT Cleaned up
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented: U
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 17.41
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

Selected Strategy(ies)Explanatory Text
N/AThis property does not incorporate demolition and cleanup activities to address climate change impacts


Top of Page


Institutional and Engineering Controls



Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The Subject Site is composed of a 17.41-acre parcel identified as: #09-17-56-100-001.000-010. The surrounding area is mixed use industrial and residential properties (Figure 1). The foundation and slab remaining from the former Exide manufacturing facility covers the northern half of the Subject Site. The Site is located on the south side of Water Street, between Aster Street and residential properties to the west and commercial properties to the east. The former Logansport & Eel River Short Line railroad adjoins along the south side of the Site with the former Trelleborg Automotive property beyond. Residential and commercial properties are located to the north across Water Street. The Subject Site is currently owned Exide Delaware, LLC. and is currently a vacant lot.

The Subject Site operated as a rail yard and was part of the Terre Haute & Indianapolis Railroad - Vandalia Line from at least 1885 - 1930s. Former railroad operations associated with the Subject Site included rail sidings and maintenance facilities (roundhouse). The Site operated as the National Steel Construction Company - Logansport Plant, manufacturers of steel products from at least 1949 to the late 1950's. General Tire reportedly operated the plant until it was purchased by Exide in 1959. Exide operated the Site as a lead-acid storage battery manufacturing facility for the automotive industry from about 1960 to approximately 1989, before fully shutting down in 2009. The former building was demolished in 2016 and has since been vacant.
Industry (17.41)
ID Number (if Applicable): 4221108 Enrolled:


Top of Page