Profile Information

Government
66641
500 West Wynnewood lots 1,6, block 93, City of Sulphur, Murray County Sulphur, OK 74525
2
34.509841 / -96.97318109999997
4
Reyes, Elizabeth
Reyes.Elizabeth@epa.gov
214-665-3163


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Oklahoma Department of Environmental QualityRP97641201OKSection 128(a) State/Tribal2006


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$1,500.0001/09/200704/04/2008Oklahoma Department of Environmental QualityYFY10
Supplemental Assessment06/03/200811/01/2008Oklahoma Department of Environmental QualityN


Is Cleanup Necessary? Yes
EPA Assessment Funding: $1,500.00
Leveraged Funding: $2,500.00
Total Funding: $4,000.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Asbestos
Lead
Petroleum Products
Cleaned Up
Cleaned Up
Cleaned Up
Building Materials
Cleaned Up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
06/03/200806/25/2010Oklahoma Department of Environmental QualityYes
06/03/200806/25/2010Oklahoma Department of Environmental QualityYes


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 2
Number of Cleanup Jobs Leveraged: 8
EPA Cleanup Funding:
Leveraged Funding: $151,000.00
Cost Share Funding:
Total Funding: $151,000.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

Yes
Proprietary Controls Information Devices
Asbestos, lead-based paint, and lead dust were abated in the former armory building. No use of the building as residential or a child occupied facility.
http://www.deq.state.ok.us/lpdnew/ICviewer.html
Yes
10/13/2010
Yes
Immobilization Process (e.g., Encapsulation, In-Situ Solidification)
Lead-based paint encapsulant was applied over lead-based paint on non-friction surfaces. Floors containing lead-based paint, and the indoor firing range were sealed with sealant. These areas should be periodically inspected and maintained.
http://www.deq.state.ok.us/lpdnew/ICviewer.html
Yes
06/25/2010


Top of Page


Redevelopment and Other Leveraged Accomplishments

Start DateLeveraged FundingCACompletion Date
10/14/2010$10,000.00Oklahoma Department of Environmental Quality06/01/2011


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The armory building was cleaned up with State funding through DEQ's Site Cleanup Assistance Program. The building is being reused by the Sulphur Public Schools as a PE facility, for cheerleading practice, and for storage of athletic equipment. Redevelopment cost is unknown, so $10,000 was used. The UST was removed on 12/5/93. The cleanup date used in ACRES is for the abatement of lead-based paint and lead dust and removal of lead contaminated soil outside indoor firing range.

Former Use: The Sulphur Armory building was built in 1936. The Sulphur Armory served as a training facility, stored military training materials, military transportation equipment, and provided maintenance. The former armory is being used as school offices.
Industry (2)
Enrolled: 06/03/2008
10/13/2010