Profile Information

Government
68921
29 Lund Road Saco, ME 04072
7.6
Map 70, Lot 4
43.524439 / -70.450448
1
Gardner, Frank
Gardner.Frank@epa.gov
617-918-1278


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Maine Department of Environmental ProtectionRP96107601MESection 128(a) State/Tribal2009
Maine Department of Environmental ProtectionRP96136101MESection 128(a) State/Tribal2010
Saco, City of BF96132001MECleanup2010
Southern Maine Regional Planning CommissionBF97187801MEAssessment2008
Southern Maine Regional Planning CommissionBF97151901MEAssessment2006


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Cleanup Planning$9,846.0002/24/201008/16/2010Maine Department of Environmental ProtectionN
Phase I Environmental Assessment$10,000.0011/01/200702/22/2008Southern Maine Regional Planning CommissionYFY10
Phase II Environmental Assessment$59,992.0003/02/200911/30/2010Southern Maine Regional Planning CommissionN
Supplemental Assessment$9,892.0009/01/201011/04/2010Maine Department of Environmental ProtectionN
Supplemental Assessment$4,939.0010/01/200905/31/2010Southern Maine Regional Planning CommissionN


Is Cleanup Necessary? Yes
EPA Assessment Funding: $94,669.00
Leveraged Funding:
Total Funding: $94,669.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Cadmium (Cd)
Copper (Cu)
Lead
Other Metals
PCBS
Petroleum Products
VOCs
Cleaned Up
Cleaned Up
Cleaned Up
Cleaned Up
Cleaned Up
Cleaned Up
NOT Cleaned up
Ground Water
Soil
NOT Cleaned up
Cleaned Up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
03/06/201310/30/2013Saco, City of Yes
03/06/2013$200,000.0010/30/2013Saco, City of Yes


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 7.6
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding: $200,000.00
Leveraged Funding:
Cost Share Funding: $40,000.00
Total Funding: $240,000.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

Yes
Information Devices
deed restriction
Yes
02/12/2015
Yes
Cover Technologies (e.g., Capping) Immobilization Process (e.g., Encapsulation, In-Situ Solidification)
Yes
10/30/2013


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Former Use: The Saco Steel site is located at 29 Lund Road and is currently owned by the City of Saco. The site is comprised of one 7.6-acre parcel that is identified by the City of Saco Assessor�s Office as Map 70, Lot 4. The site was abandoned by the previous owner, Earth Waste Systems EWS, prior to the City of Saco�s foreclosure in January 2007. The Saco Steel site is currently vacant and consists of the former main facility building on the western portion of the site, the former shear building on the central portion of the site, a capped contaminated/residual waste area in the northern central portion of the site, railroad tracks that transect the eastern portion of the site, a storm water treatment/sedimentation pond in the eastern portion of the site, paved or concrete driveway/parking areas, and vegetative areas along the perimeter of the site. According to historical records, the site was developed with the main facility building in 1978. Prior to 1978, the site was comprised of undeveloped wooded land. Saco Steel occupied the site and operated a metal recycling facility from 1979 to 1997, at which time EWS obtained the property. Site operations included scrap metal sorting and recycling as well as the crushing and processing of out-of-service automobiles automobile recycling. EWS subsequently abandoned the property, and the City of Saco acquired the site in January 2007.
Industry (7.6)
Hazardous
Enrolled: 08/02/2012
02/12/2015