Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

GE Facility
Government
93701
166 Boulder Drive Fitchburg, MA 01420
10
42.5825397 / -71.8012933
3
Castagna, Kathleen
castagna.kathleen@epa.gov
617-918-1429


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Fitchburg Redevelopment AuthorityBF97172001MAAssessment2007
Fitchburg Redevelopment AuthorityBF96190401MAAssessment2014


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Cleanup Planning$93,859.0004/01/2010Fitchburg Redevelopment AuthorityN
Phase I Environmental Assessment$20,566.0010/01/200806/30/2010Fitchburg Redevelopment AuthorityYFY09
Phase II Environmental Assessment$25,929.0001/06/200912/31/2010Fitchburg Redevelopment AuthorityN
Phase II Environmental Assessment$5,664.0002/01/201504/11/2015Fitchburg Redevelopment AuthorityN
Supplemental Assessment$21,858.0007/01/200912/31/2010Fitchburg Redevelopment AuthorityN


Is Cleanup Necessary? Yes
EPA Assessment Funding: $167,876.00
Leveraged Funding:
Total Funding: $167,876.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Asbestos
Lead
NOT Cleaned up
NOT Cleaned up
Building Materials
NOT Cleaned up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
04/01/2010Fitchburg Redevelopment Authority
04/01/2010Fitchburg Redevelopment Authority


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 10
Number of Cleanup Jobs Leveraged: 14
EPA Cleanup Funding:
Leveraged Funding: $1,100,000.00
Cost Share Funding:
Total Funding: $1,100,000.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

Yes
Proprietary Controls
There is an AUL on the site since 1999
Yes
01/01/1999
No
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

Start DateLeveraged FundingCACompletion Date
09/01/2008$1,300,000.00Fitchburg Redevelopment Authority01/27/2011
01/01/1999$30,000.00Fitchburg Redevelopment Authority


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

DRS Power Technology tenant of Putnam Place intends to install a turbine testing equipment station at the site which requires that the concrete floor be cut and footings installed. Due to the AUL on the property, a Licensed Site Professional must evaluate Site conditions and the work must be completed under the provisions of a Release Abatement Measure RAM. Once completed, this new testing system will create more jobs and be one of only three in the country. The FRA through the City of Fitchburg received funding to upgrade a new truck entrance to the Putnam Place site as well as install a loading dock to "Building #3" in the Putnam Place complex. This will allow the FRA to market the complex to a wider range of potential tenants. The FRA intends to demolish one building on the site of the complex to gain much needed parking for employees of tenants of Building #2... the building intended for demolition has been studied for the feasibility of renovating. With systems dating back to circa 1940's and non compliant ADA accessibility it has been determined that renovating the building is not an option. With this building down at the entrance of the complex the FRA will be able to showcase the other buildings on site that have been renovated and further the ability to attract new prospective tenants.

Former Use: The approximately 10-acre property was formerly used for the manufacture and testing of turbines by the General Electric Company (GE) since World War II. The buildings constructed on the property were utilized for offices, manufacturing, maintenance and storage. Operations conducted at the property by GE included machining, assembly, painting, testing, research and development, office work, storage and maintenance activities, and shipping and receiving. Operation of the facility by GE ceased in 1998.
Commercial (5) Industry (5)
Hazardous


Top of Page