Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Private
94637
21 Caller Street Peabody, MA 01960
1.1
086-151X
42.5248401 / -70.9214685
6
Stansfield, William
william.stansfield@peabody-ma.gov
978-536-7123


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
City of PeabodyBF00A00704MAAssessment2020
Peabody, City ofBF97156101MAAssessment2006


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Cleanup Planning$997.4602/14/2023City of Peabody
Phase I Environmental Assessment$1,900.0001/01/200801/11/2008Peabody, City ofYFY09
Phase I Environmental Assessment$797.5006/28/2021City of PeabodyN
Phase II Environmental Assessment$11,327.2702/14/2023City of Peabody


Is Cleanup Necessary? Unknown
EPA Assessment Funding: $15,022.23
Leveraged Funding:
Total Funding: $15,022.23


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

Selected Strategy(ies)Explanatory Text
Climate-focused Phase I and Phase II ESAsClimate-focused Phase 1 ESAs may consider current and on-going climate change impacts and consider future impacts to the site or area. For example, an investigation of the site history can include an investigation of site vulnerabilities based on historical and recent climate patterns and events (e.g., floods and drought). Climate-focused Phase 2 ESAs may include use of renewable energy, incorporating remote sensing capabilities, maximize reuse of existing wells (as appropriate) and/or design wells for future reuse, use of field test kits when possible, use of local laboratories when possible, and use of appropriate sized equipment for the project."
Updates to floodplain, coastal and wetland, and /or hazard mitigation plansUpdated plans should consider the impact of both current and projected climate-related conditions (e.g., sea level rise, proximity to a flood plain, and the frequency and severity of major storm events and droughts) on the long-term safety, stability and suitability of the proposed land reuses."
Evaluate Reuse options that are climate consciousDiscussion of observed and forecasted climate change conditions and the associated site-specific risk are part of any reuse considerations. Both current and forecasted climate changes may impact the effectiveness of a remedial alternative."
Identify potential risk factors and infrastructure or utility vulnerabilitiesIdentify potential risk factors and vulnerabilities resulting directly from the impacts of climate change." Possible risk factors and vulnerabilities may include proximity to the ocean, infrastructure vulnerabilities, property affected by a revised FEMA flood plain map, vulnerability related to changes in frequency and intensity of precipitation events, vulnerability of soil type due to moisture and hydraulic changes, and ground and surface drinking water vulnerabilities."


Top of Page


Contaminants and Media


Cadmium (Cd)
Chromium (Cr)
Lead
Other Metals
PAHS
Petroleum Products
VOCs
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Soil
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 1.1
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls



Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

In support of the City of Peabody's (the City's) desire to construct a Riverwalk along the North River Corridor, the City is evaluating property acquisition and/or easement takings at the selected properties along the corridor. Specifically, the City is interested in purchasing an approximately 0.14 acre portion of the property located along the North River canal at 21 Caller Street (Parcel ID 086-151X). The proposed Riverwalk area was previously a tannery district, and the 21 Caller Street has a documented history of releases to the environment and was regulated under the Massachusetts Contingency Plan (MCP). 21 Caller Street [Release Tracking Number (RTN) 3-0577] is closed under a Permanent Solution Statement with Conditions that includes an Activity and Use Limitation (AUL), which restricts any activity or uses that involve the excavation, removal and/or disturbance of soils greater than 3 feet below grade. The AUL is applicable to the entire parcel. The property is currently used for mixed use, including 36 apartments and several commercial businesses on main floor. Primary contaminants of concern are metals (i.e., cadmium, chromium and lead); however limited concentrations of Polycyclic Aromatic Hydrocarbons (PAHs), Volatile Organic Compounds (VOCs) and/or Extractable Petroleum Hydrocarbons (EPHs) have historically been detected at the property. Historical fill containing ash, cinders, brick, buffing dust, and/or leather scraps was also historically observed at approximately 1-8 feet below ground surface (bgs) across the property. A review of historical MCP reports (conducted by others) and an investigation conducted by Weston & Sampson in 2017, indicate contaminants of concern within the proposed Riverwalk alignment on 21 Caller Street include arsenic and lead in soil exceeding the applicable Method 1 S-1 Cleanup Standards.
Industry (1.1)
ID Number (if Applicable): RTN 3-0577 Enrolled: 07/15/1990


Top of Page