Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

218621
118 West Laurel Avenue FOLEY, AL 36535
.12
5409291101014
30.406683 / -87.6847559
1
Tolliver, Ronald
tolliver.ronald@epa.gov
404-562-8604


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
R4 TBA - Alabama (STAG Funded)n/aALTBA2004


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$8,000.0009/30/201511/30/2015R4 TBA - Alabama (STAG Funded)YFY16
Phase II Environmental Assessment$57,300.0011/30/201507/11/2016R4 TBA - Alabama (STAG Funded)N


Is Cleanup Necessary? Yes
EPA Assessment Funding: $65,300.00
Leveraged Funding:
Total Funding: $65,300.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Arsenic
Asbestos
Lead
Other Metals
VOCs
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Building Materials
Ground Water
Soil
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .12
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

Yes
Government Controls
Metals were detected in soil and groundwater samples above the respective EPA RSLs, November 2015 for residential and industrial soil and tapwater. In addition, asbestos was detected throughout the site building at greater than 1 percent, in accordance with EPA definition of ACM.
No
Yes
Immobilization Process (e.g., Encapsulation, In-Situ Solidification)
The Phase II ESA found 55 locations with LBP greater than the EPA standard of 1.0 milligram of lead per square centimeter of substrate. Engineering controls could be implemented to control the health hazard associated with LBP if material is not removed. Thirty asbestos samples contained asbestos at greater than 1%. In addition, metals were detected in soil and groundwater samples above their respective EPA RSLs, November 2015 for residential and industrial soils, and tapwater. Further, soil gas samples contained volatile organic compounds at levels that exceed calculated carcinogenic and non-carcinogenic vapor intrusion screening levels (VISLs) for residential and industrial air.
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The site occupies an approximately 0.12 acre tract of land improved with a vacant 10,000 sq foot, two story building containing kitchen equipment associated with the site's previous function as a bakery and restaurant. The site is the location of the former Foley Bakery. The building was constructed in 1925 and operated as the Foley Bakery until the 1970s. In addition, the second floor of the building was used as residential apartments until the late 1970s. The building was later used as a restaurant until 2007.
Hazardous & Petroleum


Top of Page