Profile Information

240278
600 East Lee Street BROWNWOOD, TX 76804
.8
31.718579 / -98.9788312
11
Welch, Roxanne
Welch.Roxanne@epa.gov
2146652235


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
R6 TBA - Texas (STAG Funded)n/aTXTBA2004


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$14,510.0006/07/201712/05/2017R6 TBA - Texas (STAG Funded)YFY19


Is Cleanup Necessary? Unknown
EPA Assessment Funding: $14,510.00
Leveraged Funding:
Total Funding: $14,510.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Other Contaminants
NOT Cleaned up
Unknown
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .8
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls



Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Former Use: The Crystal Ice Plant is located at 600 East Lee Street within a district consisting mostly of commercial and residential development. The 0.797-acre site contains an approximately 27,271 sq.-ft building complex consisting of eight interconnected single-story brick, cinderblock, and sheet metal structures associated with loading docks. The City used the complex for office equipment storage, however the complex is now vacant. The Crystal Ice Plant building was originally constructed in the 1920�s with modifications from 1940s to 1986. Buildings within the complex have been used for ice production, cold storage, furniture storage, a produce shop, and as a machine shop. A former rail spur ran along the northeastern boundary of the site. The Phase I ESA found the following RECs: former machine shop with many oil stains, numerous miscellaneous 55-chemical containers that were full or � full with and without labels, and an abandoned former rail spur. Business Environmental Risks found were: suspected Lead-based paint (LBP) and Asbestos containing materials (ACM) due to the age of construction and site visit observations.