Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Private
157001
39 - 41 Front Street Belfast, ME 04915
.5
Tax Map 11, Lot 137
44.4284156 / -69.0057258
2
McKeown, Amy
McKeown.AmyJean@epa.gov
617-918-1248


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Belfast, City of BF96151001MEAssessment2011


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Cleanup Planning$2,500.0008/24/201210/09/2012Belfast, City of N
Cleanup Planning$2,500.0001/14/201303/22/2013Belfast, City of N
Phase I Environmental Assessment$3,499.0006/04/201207/06/2012Belfast, City of YFY15
Phase II Environmental Assessment$24,868.0007/06/201208/24/2012Belfast, City of N
Supplemental Assessment$2,424.0009/24/201210/23/2012Belfast, City of N


Is Cleanup Necessary? No
EPA Assessment Funding: $35,791.00
Leveraged Funding:
Total Funding: $35,791.00


Top of Page


Contaminants and Media


Petroleum Products
Other Metals
PAHS
Petroleum Products
VOCs
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Petroleum Products
Ground Water
Soil
NOT Cleaned up
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .5
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Institutional and Engineering Controls

Yes
Information Devices
1) Property use remains commercial in nature; change in use requires prior written approval by MEDEP;
2) Any building constructed on the property designed for human occupancy will be constructed with a vapor barrier and/or vapor extraction system to prevent the possible migration of petroleum vapors into the building;
3) The installation of a drinking water well, or the extraction of groundwater is prohibited; and
4) Any future earth work on the property will be in compliance with a MEDEP approved Soil Management Plan (SMP) for the site. The SMP will describe procedures for all on-site excavations, segregation, soil testing and/or disposal determinations.
No
Yes
Other SSD system is in place
Any building constructed on the property designed for human occupancy must be constructed with a vapor barrier and/or vapor extraction system to prevent the possible migration of petroleum vapors into the building.
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Additional Property Attributes

Former Use: The Site includes a gravel driveway and two buildings: the Shop Office and the Spar Shed. The Shop Office is currently used as the operating office of Belfast Boatyard and contains maintenance tools, supplies, and equipment. The Spar Shed building is used for boat maintenance and the storage of boat masts. Waste oil generated by boat maintenance activities is stored in several aboveground storage tanks (ASTs) located in the Spar Shed and is utilized as fuel by a waste oil burner unit located in the Spar Shed building. Municipal sewer and water utilities are available at the Site. Based on available information, the Site has been utilized as a waterfront wharf, since at least 1855. Historic uses include the storage of coal, grain, guano, flour, hay, fertilizer, and livestock feed. The existing Site buildings were constructed in the 1980s and 1990s and the Site has been utilized as a boatyard to the present date. The proposed reuse scenario for the Site is to remain a boatyard with similar commercial boat storage, maintenance, and repair operations.
Hazardous
Enrolled: 09/07/2012
10/09/2012


Top of Page