Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Private
16088
100 River Street Springfield, VT 05156
10.7
43.301615 / -72.48598700000002
1
Byrne, James
byrne.james@epa.gov
617-918-1389


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Southern Windsor County Reg. Planning. Comm.2B96121201VTBCRLF2009
Southern Windsor County Regional Planning CommissionBF97144501VTAssessment2008
Southern Windsor County Regional Planning CommissionBF96193601VTBCRLF2014
Southern Windsor County Regional Planning CommissionBP98108201VTAssessment1999
Southern Windsor County Regional Planning CommissionBF98191401VTBCRLF2003
Southern Windsor County Regional Planning CommissionBF97110501VTAssessment2004
Southern Windsor County Regional Planning CommitteeBF96133501VTAssessment2010
Vermont Agency of Commerce & Community Development2B96120201VTBCRLF2009
Vermont Agency of Commerce and Community DevelopmentBF97156901VTBCRLF2006
Vermont Department of Environmental ConservationRP96129401VTSection 128(a) State/Tribal2010
Vermont Department of Environmental ConservationRP97189301VTSection 128(a) State/Tribal2008


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Cleanup Planning$5,500.0003/17/200904/01/2009Southern Windsor County Regional Planning CommissionN
Cleanup Planning$7,000.0010/02/200910/22/2009Vermont Department of Environmental ConservationN
Phase I Environmental Assessment$1,674.6209/01/200509/01/2005Southern Windsor County Regional Planning CommissionYFY06
Phase I Environmental Assessment$1,964.0010/15/201011/23/2010Southern Windsor County Regional Planning CommitteeN
Phase I Environmental Assessment04/01/200805/10/2008Southern Windsor County Regional Planning CommissionN
Phase I Environmental Assessment11/01/200312/01/2003Southern Windsor County Regional Planning CommissionN
Phase II Environmental Assessment09/01/200803/01/2009Southern Windsor County Regional Planning CommissionN
Supplemental Assessment$48,325.3803/24/200603/24/2006Southern Windsor County Regional Planning CommissionN


Is Cleanup Necessary? Yes
EPA Assessment Funding: $64,464.00
Leveraged Funding: $73,000.00
Total Funding: $137,464.00


Top of Page


Contaminants and Media


Petroleum Products
Asbestos
PCBS
Petroleum Products
VOCs
Cleaned Up
Cleaned Up
Cleaned Up
Cleaned Up
NOT Cleaned up
Petroleum Products
Ground Water
Soil
Cleaned Up
Cleaned Up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
11/01/2009$107,000.00Vermont Department of Environmental ConservationNo
09/21/2015$35,000.00Vermont Agency of Commerce and Community Development
10/06/2008$344,114.00Southern Windsor County Regional Planning Commission
10/06/2008$519,000.00Southern Windsor County Regional Planning Commission
10/06/2008Southern Windsor County Regional Planning Commission
10/06/2008$200,000.00Southern Windsor County Regional Planning Commission
10/06/2008$76,164.00Southern Windsor County Reg. Planning. Comm.No
10/06/2008$110,000.00Vermont Agency of Commerce & Community DevelopmentNo
10/05/2016Southern Windsor County Regional Planning CommissionNo
10/05/2016$39,478.00Southern Windsor County Regional Planning CommissionNo
04/17/2006Southern Windsor County Regional Planning CommissionNo
11/04/2011$30,104.00Vermont Department of Environmental ConservationNo


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 10.7
Number of Cleanup Jobs Leveraged: 25
EPA Cleanup Funding: $1,460,860.00
Leveraged Funding: $750.00
Cost Share Funding: $222,870.00
Total Funding: $1,684,480.00


Top of Page


Institutional and Engineering Controls

Yes
Proprietary Controls Information Devices
Site building materials have PCB exceedances and will have 6" of concrete over all floor surfaces, walls will all have epoxy paint. Deed restrictions on property will be dual state and federal consent.
Yes
04/19/2012
Yes
Cover Technologies (e.g., Capping) Immobilization Process (e.g., Encapsulation, In-Situ Solidification)
Site building materials have PCB exceedances and will have 6" of concrete over all floor surfaces, walls will all have epoxy paint. Deed restrictions on property will be dual state and federal consent.
Yes
04/19/2012


Top of Page


Redevelopment and Other Leveraged Accomplishments

Start DateLeveraged FundingCACompletion Date
11/24/2010$700,000.00Southern Windsor County Regional Planning Commission
11/24/2010$5,000,000.00Southern Windsor County Regional Planning Commission
11/24/2010$400,000.00Southern Windsor County Regional Planning Commission
04/19/2012$1,000.00Southern Windsor County Regional Planning Committee


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Additional Property Attributes

The existing, partially-occupied building is strategically located in a mixed-use, multi-story office/industrial complex, consisting of approximately 55,000 square feet of office space and approximately 200,000 square feet of industrial space. The property fronts the Black River to the east and Pearl Street to the west. A metal-truss foot bridge, which crosses over the Black River, permits easy access by pedestrian traffic to the partially-occupied building from River Street. Revitalizing this historic river front complex, located within the Town�s Designated Downtown area, while retaining its vintage charm and appeal, will permit state-of-the-art technology and unlimited capabilities for existing and future tenants and add to the economic base of the Precision Valley. Redevelopment of this property includes renovating the historic office building into office space for professional or medical use, and other buildings will be renovated for mixed use, including light industrial, commercial, and/or high-technology applications. Active negotiations are underway for a variety of leases for this project, including those listed above. The office component of this project is expected to house and employ many medical specialties to better serve the neighboring communities. The office component will serve as an anchor for the site, acting to draw people to the complex that will stay for other reasons. Employment opportunities for approximately 60 to 70 staff are anticipated, excluding personnel needed for secondary services. Simultaneously, the developer is negotiating an additional 40,000 square feet of space for industrial use to permit manufacturing of high technology equipment for both automotive and military applications. The future re-development of the building's shell will require installation of insulated flat roofs, replacement of existing factory windows to include insulated glazing, and installation of energy-efficient heating and cooling systems. Re-engineering will include the removal of approximately 57,000 square feet of existing deteriorated wood structures to allow for additional on-site parking, sidewalks, site lighting, and landscaping green space. The developer has confirmed that the Historic Register mandates historic review prior to modification of the building's structure and/or fa�e. Therefore, the applicant has been meeting with, and will be working directly with the Vermont Division of Historic Preservation and the Preservation Trust in Washington, D.C. to ensure compliance with pertinent historical rehabilitation guidelines. Environmental challenges have been identified for the site, and the proposed redevelopment will consider these challenges during implementation. As an example, site soil that is contaminated with oil will be removed to the extent practicable during site work activity or use limitations will be implemented to minimize health risks for areas where complete hazard removal is not feasible. This building is unique in that it contains a green-energy component. While an existing 100 KW hydro-electric generating station is not currently contributing to the power grid, re-development plans include upgrading the turbine equipment to provide a source of energy with zero carbon emissions. The future developer is entering into leases with a minimum term of five years with tenants. The projected improvement costs, including site work and rehabilitation of the remaining building for tenant use, is estimated at 6.5 million. As of 3/6/09 all asbestos abatement has been completed on the property. A draft CAP was completed on 3/17/09 and awaiting TSCA approval for PCB 761.61 c risk-based management plan for rest of site. 3/30/09 final approval from TSCA to go ahead with 761.61 c plan for approximately 60,000 s.f. of commercial space for tenant occupancy on 6/1/09. Jobs will be added to ACRES. On March 31, 2009, TSCA issued an approval for a Risk-Based Cleanup in Building B and the Northern Loading Dock
Industry (10.7)
Hazardous & Petroleum
ID Number (if Applicable): 972235 Enrolled: 03/30/2009


Top of Page