Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Government
123802
2222 SW 44th Street oklahoma city, OK 73119
5
35.4205028 / -97.5517574
3
Reyes, Elizabeth
Reyes.Elizabeth@epa.gov
214-665-3163


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Oklahoma Department of Environmental QualityRP96681001OKSection 128(a) State/Tribal2008


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$1,500.0007/01/201011/12/2010Oklahoma Department of Environmental QualityYFY11
Supplemental Assessment03/31/201107/11/2011Oklahoma Department of Environmental QualityN


Is Cleanup Necessary? Yes
EPA Assessment Funding: $1,500.00
Leveraged Funding: $2,500.00
Total Funding: $4,000.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Asbestos
Lead
Cleaned Up
Cleaned Up
Building Materials
Cleaned Up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
05/01/201108/08/2012Oklahoma Department of Environmental QualityYes


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 5
Number of Cleanup Jobs Leveraged: 4
EPA Cleanup Funding:
Leveraged Funding: $85,000.00
Cost Share Funding:
Total Funding: $85,000.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

Yes
Information Devices
Abatement of asbestos, lead-based paint, and lead dust.
http://www.deq.state.ok.us/lpdnew/ICviewer.html
Yes
09/28/2012
Yes
Immobilization Process (e.g., Encapsulation, In-Situ Solidification)
Lead-based paint encapsulant was applied over lead-based paint on non-friction surfaces.
http://www.deq.state.ok.us/lpdnew/ICviewer.html
Yes
09/28/2012


Top of Page


Redevelopment and Other Leveraged Accomplishments

Start DateLeveraged FundingCACompletion Date
09/28/2012$10,000.00Oklahoma Department of Environmental Quality


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The armory building was cleaned up with State funding through DEQ's Site Cleanup Assistance Program. The building has been renovated and is being used by Santa Fe South Schools. Redevelopment is estimated to cost $10,000.

Former Use: The land is owned by the City of Oklahoma City and leased to the State of Oklahoma on Nov 28, 1962 to build the armory. The armory is currently being vacated by the Oklahoma Army National Guard. DEQ will clean up lead and asbestos in the building and the building will be turned over to the City of Oklahoma City. A newspaper article June 14, 1963 indicates that the site was a city park before the armory. The armory is surrounded by grassy areas on all sides and by paved parking areas on the east, west, and south sides. The vehicle compound is located on the east side and is bordered by Brock Creek. To the north are a bowling alley, restaurants, apartments, and a gas station. To the east are Young�s Park, a residential area, and some commercial properties. To the south, Young�s Park, to the west is a residential area. Since this area of oil and gas development is located on an adjacent property, it is considered a REC. One gas well is currently operating onsite. No other RECs other than the possible IFR and buried sand trap in the drill floor were found at the site during the site visit Nov 2, 2010. Information provided by the Oklahoma Military Department OMD indicates that there was an indoor firing range in the armory on or before 1997 and that lead sampling was performed on the IFR in 1991. A news article dec 25, 1962 indicates that preliminary plans for the armory included a large, rectangular drill hall with a rifle range and doubling as a recreation hall and athletic gymnasium. There is thus a potential for lead dust in the building. Also, due to the age of the building there is a potential for asbestos and lead based paint and a potential for lead dust in the building due to weapons fire and cleaning. Meth houses have been reported nearby,one of which recently caught fire, therefore this is considered a REC due to the potential air emissions associated with chemicals burning.
Enrolled: 03/31/2011
09/28/2012


Top of Page