166821
Township 19, north of Columbia Falls, Maine Township 19, north of Columbia Falls, Maine Columbia Falls, ME 04000
492.6
44.79222 / -67.768333
2
McKeown, Amy
McKeown.AmyJean@epa.gov
617-918-1248


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Passamaquoddy TribeBF96176101MEAssessment2013
Passamaquoddy Tribe Pleasant PointRP96167501MESection 128(a) State/Tribal2012
Pleasant Point Indian ReservationRP96189401MESection 128(a) State/Tribal2014
Pleasant Point Indian ReservationRP00A00042MESection 128(a) State/Tribal2016
Pleasant Point Indian ReservationRP00A00041MESection 128(a) State/Tribal2015


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$9,181.0002/25/2013Passamaquoddy Tribe Pleasant PointN
Phase II Environmental Assessment$28,178.0007/15/201609/30/2016Passamaquoddy TribeYFY17


Is Cleanup Necessary? No
EPA Assessment Funding: $37,359.00
Leveraged Funding:
Total Funding: $37,359.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media



Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
10/01/2015$5,110.0012/18/2015Pleasant Point Indian ReservationYes


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 492.6
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding: $5,110.00
Leveraged Funding:
Cost Share Funding:
Total Funding: $5,110.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

No
No
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Potential future land use may be production of alternative energy through wind or solar.

Former Use: The Subject Property includes 492.60 acres of land previously operated by the U.S. Government as part of an over-the-horizon backscatter radar facility. The setting is rural and adjacent land use is primarily agricultural, used for the cultivation of blueberries and cranberries. The Subject Property includes two distinct areas identified as Sector 1 and Sector 3, respectively. Each sector previously supported an antenna array comprised primarily of a metal ground screen that extended approximately 5,000 feet in length and 1,000 feet in width. The majority of metal ground screen was recently removed from the Subject Property, however, wooden perimeter fencing and small sections of ground screen remain. Sector 1 of the Subject Property includes a large single story metal receiver building and a small garage, both constructed on concrete slabs. Sector 3 includes a single Receiver Building, also constructed of metal on a concrete slab. Both sectors are serviced by private water supply wells and septic systems. The facility was originally developed by General Electric Aerospace beginning in the early 1980�s and was only operational for approximately 3 months between 1993 and 1994. The facility was placed in �caretaker status� in 1997 and is currently vacant and unused.
Industry (492.6)
Hazardous
Enrolled: 02/06/2013


Top of Page