Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Government
172024
113A East Canal Street Shelton, CT 06484
.3
41.3171427 / -73.09150879999998
3
Byrne, James
byrne.james@epa.gov
617-918-1389


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
City of SheltonBF96195501CTCleanup2014
R1 TBA - Connecticut (STAG Funded)n/aCTTBA2004


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase II Environmental Assessment$83,000.0005/01/201212/31/2012R1 TBA - Connecticut (STAG Funded)YFY14


Is Cleanup Necessary? Yes
EPA Assessment Funding: $83,000.00
Leveraged Funding:
Total Funding: $83,000.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


PAHS
Petroleum Products
VOCs
Cleaned Up
Cleaned Up
Cleaned Up
Soil
Cleaned Up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
10/01/2016$200,000.0011/26/2018City of SheltonNo


Cleanup/Treatment Implemented: Y
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info: Clean soil cap (4 feet) placed over subsurface soils
Address of Data Source:
Total ACRES Cleaned Up: .3
Number of Cleanup Jobs Leveraged: 5
EPA Cleanup Funding: $200,000.00
Leveraged Funding:
Cost Share Funding:
Total Funding: $200,000.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

Yes
Information Devices
Environmental Land Use Restriction is necessary for this site to maintain the clean cover of soil over the remaining pollueted soil.
No
Yes
Cover Technologies (e.g., Capping)
Yes
11/26/2018


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The property is located adjacent to another site of 1.0 acres. Together, they make a developable lot in this downtown area.

Former Use: The Site consists of a vacant 0.3-acre parcel of land located in the downtown industrial area known as the Shelton Enterprise and Commerce Park. Formerly, a historical mill building associated with the Chromium Process Company occupied the Site and two adjoining properties along Canal Street. The adjoining properties, known as the Samarius and Axton Cross properties, border the Site to the northwest and southeast, respectively. The Housatonic River and the Penn Central railroad and trestle border the Site to the northeast. Canal Street and the Chromium Process Company (across Canal Street) border the site to the west and southwest. Historically, the Chromium Process Storage Parcel was occupied by a two-story corrugated metal building and a concrete vault-like structure. These buildings were demolished by the City in the late 1980s. Building remnants, including foundation walls and an old concrete courtyard, are present in the center of the Site.
Industry (.3)
Hazardous
ID Number (if Applicable): 12858 Enrolled: 09/12/2016
11/26/2018


Top of Page