Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Government
238413
264 East Westbrook Street WEST POINT, MS 39773
7.56
33.6027211 / -88.6446603
1
Nolan, Cindy
Nolan.CindyJ@epa.gov
404-562-8425


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Golden Triangle Planning & Development Inc.BF00D60817MSAssessment2017


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$3,000.0011/01/201812/03/2018Golden Triangle Planning & Development Inc.YFY20


Is Cleanup Necessary? Unknown
EPA Assessment Funding: $3,000.00
Leveraged Funding:
Total Funding: $3,000.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media



Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 7.56
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls



Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Former Use: Number of Parcels and Acreage - One parcel totaling 7.56 acres Northern Portion: A school building, residence and six outbuildings were present on the northern portion of the property in at least 1898. A primary school building was constructed on the northeastern portion of the property and a roadway �School� were developed on the property between 1898 and 1905. Between 1918 and 1925, additions were constructed on the northern, eastern, southern and western faces of the northern school building; additionally, and an outbuilding was constructed south of the northern school building. Between 1925 and 1941, the two school buildings and outbuilding were demolished. The current northeastern school building was constructed in 1928. The current northwestern school building was constructed in 1948. By 1959 the roadway �School� was no longer visible on the property. An addition was constructed on the western face of the northeastern school building between 1985 and 1992. An addition was constructed on the southern face of the northwestern school building between 1997 and 2006. The current school buildings have been vacant since at least July 2018. Southern Portion: Between 1898 and 1905, six residences and eight outbuildings were constructed on the southern portion of the property. Between 1905 and 1910, two outbuildings were demolished and one outbuilding was constructed on the southern portion of the property. Between 1910 and 1918, a residence and five outbuildings were demolished. The current resource building was constructed on the eastern portion of the property between 1959 and 1985. The remainder of the residences and outbuildings were demolished between 1959 and 2006.
Commercial (7.56)
Hazardous


Top of Page