Profile Information

258102
69 South Main Street PHILIPPI, WV 26416
.07
01-08-008A-0022-0000
39.151502982318 / -80.037968978303
2


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
R3 TBA - West Virginia (STAG Funded)n/aWVTBA2004


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$14,705.8301/26/202207/25/2022R3 TBA - West Virginia (STAG Funded)YFY24
Phase II Environmental Assessment$17,063.2507/25/202201/17/2023R3 TBA - West Virginia (STAG Funded)N


Is Cleanup Necessary? Yes
EPA Assessment Funding: $31,769.08
Leveraged Funding:
Total Funding: $31,769.08


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Building Materials
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .07
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls



Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

"Based on the results of the ACM and LBP inspections, EnviroCheck found that abatement is not necessary for all
ACM that has less than 1% chrysotile. However, approximately 2,280 square feet of ceiling board and pipe patch
with chrysotile asbestos concentrations ranging from 25% to 65% identified in the basement will require abatement
if disturbed during building renovations or before demolition of the building. If abatement of the ACM in the
structure is conducted, it should be conducted in accordance with applicable regulations before renovations and/or
demolition by a West Virginia licensed ACM abatement contractor. EnviroCheck also stated that while many
materials tested negative for LBP, the materials when disturbed, may generate lead dust greater than the permissible
exposure limit of 50 micrograms per cubic meter established by the OSHA "Lead Exposure in Construction Rule""

"The Subject Property is currently used as a residential apartment building on the upper floors and with commercial entities and residences on the first floor. First floor tenants include a hair salon and two residential tenants. The second floor is comprised of two apartments and a closet; the third floor is comprised of one apartment. There a fire escape located on the
outside of the building."
Commercial (.07)