Project Summary Report

    Use the dropdown menus below to select the parameters of interest and click the 'Search' button. Click the Document icon to access a summary report of a particular project. Review the GRTS Interactive Report Guide for detailed instructions.


     
    • 1 - 100 of 7,228
    State: AK, Award Fiscal Year: 2024, Grant No: 02J41001, Grantee: AK DEPT OF ENVIRON CONSERV
    LinkProject NumberTitleState Wide ProjectPrimary Functional CategoryCategory Of PollutionTMDLTotal 319h FundsHas Pollutant DataCurrent StatusProject StartProject End
    01Chignik Subregional Watershed PlanNoEducation/Information Construction; Historical Pollutants; Hydromodification; Land Disposal/Storage/Treatment; Marinas and Recreational Boating; Urban Runoff/StormwaterNOT APPLICABLE (NA)$0No-Will start on 03/01/2023Will be Completed On 02/28/2025
    02Kenai River Center Rain GardenNoEducation/Information Urban Runoff/StormwaterNOT APPLICABLE (NA)$0No-Will start on 03/01/2023Will be Completed On 02/28/2025
    03Watershed Characterization for Nome & Snake River WatershedsNoEducation/Information Historical Pollutants; Hydromodification; Resource Extraction; Urban Runoff/StormwaterNOT APPLICABLE (NA)$0No-Will start on 03/01/2023Will be Completed On 02/28/2025
    04Bacteria Pollution Reduction in Ketchikan through Education & OutreachNoEducation/Information Land Disposal/Storage/Treatment; Marinas and Recreational Boating; Urban Runoff/StormwaterNOT APPLICABLE (NA)$0No-Will start on 03/01/2023Will be Completed On 02/28/2025
    05Urban Riparian Assessment & Stormwater Best Management Practices Options - KetchikanNoEducation/Information Hydromodification; Urban Runoff/StormwaterNOT APPLICABLE (NA)$0No-Will start on 03/01/2023Will be Completed On 02/28/2025
    06Water Quality Monitoring in Ketchikan's Urban CreeksNoEducation/Information Construction; Urban Runoff/StormwaterNOT APPLICABLE (NA)$0No-Will start on 03/01/2023Will be Completed On 02/28/2025
    07Skagway Rain Garden ExpansionNoBMP Implementation Urban Runoff/StormwaterImplementing a TMDL$0No-Will start on 03/01/2023Will be Completed On 02/28/2025
    08Identification and Prioritization of Green Infrastructure Needs at Chena River Road CrossingsNoBMP Design Urban Runoff/StormwaterNOT APPLICABLE (NA)$0No-Will start on 03/01/2023Will be Completed On 02/28/2025
    09Chena River Fairbanks Parks Pet Waste Reduction & EducationNoEducation/Information Urban Runoff/StormwaterNOT APPLICABLE (NA)$0No-Will start on 03/01/2023Will be Completed On 02/28/2025
    10Alaska Sea Grant Fellowship to Advance Alaska Clean Harbors ProgramYesEducation/Information Marinas and Recreational BoatingNOT APPLICABLE (NA)$84,099No-Will start on 07/01/2023Will be Completed On 06/30/2024
    11Kenai River Metals MonitoringNoMonitoring Design Construction; Marinas and Recreational Boating; Silviculture; Urban Runoff/StormwaterNOT APPLICABLE (NA)$0No-Will start on 07/01/2023Will be Completed On 06/30/2028
    12Bristol Bay PathogensNoBMP Effectiveness Monitoring Land Disposal/Storage/Treatment; Marinas and Recreational Boating; Urban Runoff/StormwaterNOT APPLICABLE (NA)$0No-Will start on 03/01/2022Will be Completed On 02/28/2024
    Sum : $84,099
    State: AK, Award Fiscal Year: 2022, Grant No: 00J84605, Grantee: AK DEPT OF ENVIRON CONSERV
     Project NumberTitleState Wide ProjectPrimary Functional CategoryCategory Of PollutionTMDLTotal 319h FundsHas Pollutant DataCurrent StatusProject StartProject End
    10Salcha River Water Quality MonitoringNoMonitoring Design Marinas and Recreational Boating; Urban Runoff/StormwaterNOT APPLICABLE (NA)$31,279NoCompletedWill start on 03/01/2021Will be Completed On 02/28/2023
    11Lake Lucile Bioretention Installation at Nunley Park & Watershed Health OutreachNoBMP Implementation Urban Runoff/StormwaterImplementing a TMDL$25,785NoCompletedWill start on 03/01/2021Will be Completed On 02/28/2023
    12Jordan Creek Restoration & Implementation of Best Mgmt PracticesNoBMP Implementation Hydromodification; Urban Runoff/StormwaterImplementing a TMDL$56,629NoCompletedWill start on 03/01/2021Will be Completed On 06/30/2023
    13Chena River Water Quality MonitoringNoMonitoring Design Urban Runoff/StormwaterNOT APPLICABLE (NA)$4,926NoCompletedWill start on 03/01/2021Will be Completed On 02/28/2023
    14Clearer Creeks in the Interior - Placer Mining OutreachNoEducation/Information Resource ExtractionImplementing a TMDL$2,355NoDiscontinuedWill start on 03/01/2021Will be Completed On 01/30/2023
    15No Litter YES Healthy Slough - Noyes Slough OutreachNoEducation/Information Other NPS Pollution; Urban Runoff/StormwaterImplementing a TMDL$925NoDiscontinuedWill start on 03/01/2021Will be Completed On 01/30/2023
    16Lacey Street Rehabilitation Planning & OutreachNoEducation/Information Urban Runoff/StormwaterNOT APPLICABLE (NA)$2,500NoDiscontinuedWill start on 03/01/2021Will be Completed On 01/30/2023
    17Anchor River RestorationNoBMP Implementation Other NPS PollutionNOT APPLICABLE (NA)$6,460NoCompletedWill start on 03/01/2021Will be Completed On 02/28/2023
    18Playground Creek Rain GardenNoBMP Implementation Urban Runoff/StormwaterNOT APPLICABLE (NA)$13,475NoCompletedWill start on 07/01/2022Will be Completed On 06/30/2023
    19Chignik Subregional Watershed PlanNoEducation/Information Construction; Historical Pollutants; Hydromodification; Land Disposal/Storage/Treatment; Marinas and Recreational Boating; Urban Runoff/StormwaterNOT APPLICABLE (NA)$5,775NoOn ScheduleWill start on 03/01/2023Will be Completed On 02/28/2025
    20Kenai River Center Rain GardenNoEducation/Information Urban Runoff/StormwaterNOT APPLICABLE (NA)$5,580NoOn ScheduleWill start on 03/01/2023Will be Completed On 02/28/2025
    21Watershed Characterization for Nome & Snake River WatershedsNoEducation/Information Historical Pollutants; Hydromodification; Resource Extraction; Urban Runoff/StormwaterNOT APPLICABLE (NA)$10,777NoOn ScheduleWill start on 03/01/2023Will be Completed On 02/28/2025
    22Bacteria Pollution Reduction in Ketchikan through Education & OutreachNoEducation/Information Land Disposal/Storage/Treatment; Marinas and Recreational Boating; Urban Runoff/StormwaterNOT APPLICABLE (NA)$6,247NoOn ScheduleWill start on 03/01/2023Will be Completed On 02/28/2025
    23Urban Riparian Assessment & Stormwater Best Management Practices Options - KetchikanNoEducation/Information Hydromodification; Urban Runoff/StormwaterNOT APPLICABLE (NA)$1,995NoOn ScheduleWill start on 03/01/2023Will be Completed On 02/28/2025
    24Water Quality Monitoring in Ketchikan's Urban CreeksNoEducation/Information Construction; Urban Runoff/StormwaterNOT APPLICABLE (NA)$20,545NoOn ScheduleWill start on 03/01/2023Will be Completed On 02/28/2025
    25Skagway Rain Garden ExpansionNoBMP Implementation Urban Runoff/StormwaterImplementing a TMDL$6,229NoRevisedWill start on 03/01/2023Will be Completed On 02/28/2025
    26Identification and Prioritization of Green Infrastructure Needs at Chena River Road CrossingsNoBMP Design Urban Runoff/StormwaterNOT APPLICABLE (NA)$15,028NoOn ScheduleWill start on 03/01/2023Will be Completed On 02/28/2025
    27Chena River Fairbanks Parks Pet Waste Reduction & EducationNoEducation/Information Urban Runoff/StormwaterNOT APPLICABLE (NA)$30,000NoOn ScheduleWill start on 03/01/2023Will be Completed On 02/28/2025
    29Kenai River Metals MonitoringNoMonitoring Design Construction; Marinas and Recreational Boating; Silviculture; Urban Runoff/StormwaterNOT APPLICABLE (NA)$17,820NoCompletedWill start on 04/01/2022Will be Completed On 12/31/2022
    30Bristol Bay PathogensNoBMP Effectiveness Monitoring Land Disposal/Storage/Treatment; Marinas and Recreational Boating; Urban Runoff/StormwaterNOT APPLICABLE (NA)$14,254NoOn ScheduleWill start on 07/01/2022Will be Completed On 06/30/2023
    Sum : $278,584
    State: AK, Award Fiscal Year: 2018, Grant No: 00J84604, Grantee: AK DEPT OF ENVIRON CONSERV
     Project NumberTitleState Wide ProjectPrimary Functional CategoryCategory Of PollutionTMDLTotal 319h FundsHas Pollutant DataCurrent StatusProject StartProject End
    01Reduce Bacteria Pollution - Anchorage BowlNoBMP Effectiveness Monitoring Urban Runoff/StormwaterImplementing a TMDL$37,554NoCompletedWill start on 03/01/2019Will be Completed On 02/28/2021
    02Kenai River Water Quality Monitoring and AssessmentNoEducation/Information Marinas and Recreational Boating; Other NPS Pollution; Urban Runoff/StormwaterNOT APPLICABLE (NA)$101,491NoCompletedWill start on 03/01/2019Will be Completed On 04/30/2021
    03Little Susitna River Total Aromatic Hydrocarbon (TAH) MonitoringNoBMP Effectiveness Monitoring Marinas and Recreational BoatingNOT APPLICABLE (NA)$63,627NoCompletedWill start on 03/04/2019Will be Completed On 02/28/2021
    13Ketchikan Beaches and Watersheds ManagementNoBMP Design Land Disposal/Storage/Treatment; Urban Runoff/StormwaterNOT APPLICABLE (NA)$37,202NoCompletedWill start on 04/03/2019Will be Completed On 06/30/2021
    14Water Chemistry Evaluation for Bristol BayNoMonitoring Design Other NPS Pollution; Resource ExtractionNOT APPLICABLE (NA)$29,886NoCompletedWill start on 03/01/2019Will be Completed On 02/28/2020
    15Low-Impact Development Planning for the City of HomerNo-Construction; Urban Runoff/StormwaterNOT APPLICABLE (NA)$59,785NoCompletedWill start on 03/13/2019Will be Completed On 06/30/2020
    16Scaling Green Infrastructure in FairbanksNoBMP Implementation Marinas and Recreational Boating; Urban Runoff/StormwaterNOT APPLICABLE (NA)$88,500NoCompletedWill start on 03/01/2019Will be Completed On 02/28/2021
    17Controlling Urban Runoff to Cottonwood Creek, Phase 2NoBMP Implementation Urban Runoff/StormwaterImplementing a TMDL$58,326NoCompletedWill start on 03/18/2019Will be Completed On 02/28/2021
    18Jordan Creek Watershed (Juneau)NoBMP Design Urban Runoff/StormwaterImplementing a TMDL$91,932NoCompletedWill start on 04/03/2019Will be Completed On 06/30/2021
    21DEC NPS Staff Time: Project ImplementationYesOther Restoration/Protection Construction; Marinas and Recreational Boating; Resource Extraction; Urban Runoff/StormwaterNOT APPLICABLE (NA)$2,126,631No-Will start on 07/01/2018Will be Completed On 06/30/2021
    22DEC NPS STaff Time: Program WorkYesOther Planning Construction; Marinas and Recreational Boating; Resource Extraction; Urban Runoff/StormwaterNOT APPLICABLE (NA)$3,451,215No-Will start on 07/01/2018Will be Completed On 06/30/2021
    23Lake Lucille Lake Management PlanNoBMP Design Urban Runoff/StormwaterImplementing a TMDL$30,000NoCompletedWill start on 07/01/2019Will be Completed On 06/30/2020
    25Anchorage Streams Pathogens MonitoringNoBMP Effectiveness Monitoring Urban Runoff/StormwaterImplementing a TMDL$16,884NoCompletedWill start on 04/01/2020Will be Completed On 06/30/2021
    26ACWA Prioritization Model DevelopmentYesGIS/Modeling Construction; Marinas and Recreational Boating; Other NPS Pollution; Resource Extraction; Urban Runoff/StormwaterNOT APPLICABLE (NA)$49,981No-Will start on 07/01/2019Will be Completed On 06/30/2021
    28Gold Systems Contract - AWQMS License, Maintenance and SupportYesWater Quality Assessment/Monitoring Construction; Historical Pollutants; Hydromodification; Marinas and Recreational Boating; Resource Extraction; Urban Runoff/StormwaterNOT APPLICABLE (NA)$30,279No-Will start on 07/01/2018Will be Completed On 06/30/2021
    29Salcha River Water Quality MonitoringNoMonitoring Design Marinas and Recreational Boating; Urban Runoff/StormwaterNOT APPLICABLE (NA)$30,988NoCompletedWill start on 03/01/2021Will be Completed On 02/28/2023
    30Lake Lucile Bioretention Installation at Nunley Park & Watershed Health OutreachNoBMP Implementation Urban Runoff/StormwaterImplementing a TMDL$44,315NoCompletedWill start on 03/01/2021Will be Completed On 02/28/2023
    31Jordan Creek Restoration & Implementation of Best Mgmt PracticesNoBMP Implementation Urban Runoff/StormwaterImplementing a TMDL$54,065NoCompletedWill start on 03/01/2021Will be Completed On 06/30/2023
    32Chena River Water Quality MonitoringNoMonitoring Design Urban Runoff/StormwaterNOT APPLICABLE (NA)$9,012NoCompletedWill start on 03/01/2021Will be Completed On 02/28/2023
    33Clearer Creeks in the Interior - Placer Mining OutreachNoEducation/Information Resource ExtractionImplementing a TMDL$23,930NoDiscontinuedWill start on 03/01/2021Will be Completed On 02/28/2023
    34No Litter YES Healthy Slough - Noyes Slough OutreachNoEducation/Information Other NPS Pollution; Urban Runoff/StormwaterImplementing a TMDL$7,394NoDiscontinuedWill start on 03/01/2021Will be Completed On 02/28/2023
    35Lacey Street Rehabilitation Planning & OutreachNoEducation/Information Urban Runoff/StormwaterNOT APPLICABLE (NA)$14,970NoDiscontinuedWill start on 03/01/2021Will be Completed On 02/28/2023
    36Anchor River RestorationNoBMP Implementation Other NPS PollutionNOT APPLICABLE (NA)$33,117NoCompletedWill start on 03/01/2021Will be Completed On 02/28/2023
    37Contract Lab Services Summer FY22NoMonitoring Design Urban Runoff/StormwaterNOT APPLICABLE (NA)$1,619NoCompletedWill start on 07/01/2021Will be Completed On 08/31/2021
    38Kenai River Metals MonitoringNoMonitoring Design Urban Runoff/StormwaterNOT APPLICABLE (NA)$42,781NoCompletedWill start on 04/01/2021Will be Completed On 09/30/2021
    39Salcha River WQ MonitoringNoMonitoring Design Marinas and Recreational BoatingNOT APPLICABLE (NA)$1,248NoCompletedWill start on 05/01/2021Will be Completed On 09/30/2022
    40Kenai River Metals Monitoring Summer 2022NoMonitoring Design Construction; Marinas and Recreational Boating; Urban Runoff/StormwaterNOT APPLICABLE (NA)$13,700NoCompletedWill start on 04/01/2022Will be Completed On 12/31/2022
    42AWQMS Cloud Service & SupportYesWater Quality Assessment/Monitoring Construction; Historical Pollutants; Urban Runoff/StormwaterNOT APPLICABLE (NA)$13,203NoCompletedWill start on 07/01/2021Will be Completed On 06/30/2023
    43Playground Creek Rain GardenNoBMP Implementation Urban Runoff/StormwaterNOT APPLICABLE (NA)$3,410NoCompletedWill start on 07/01/2021Will be Completed On 06/30/2022
    Sum : $6,567,045
    State: AK, Award Fiscal Year: 2016, Grant No: 00J84603, Grantee: AK DEPT OF ENVIRON CONSERV
     Project NumberTitleState Wide ProjectPrimary Functional CategoryCategory Of PollutionTMDLTotal 319h FundsHas Pollutant DataCurrent StatusProject StartProject End
    01Stormwater Analysis on Cottonwood CreekNoGIS/Modeling Urban Runoff/StormwaterImplementing a TMDL$28,376NoCompletedDid start on 07/11/2016Will be Completed On 06/30/2017
    02Duck Creek Nancy Street Wetland AssessmentNo-Urban Runoff/StormwaterImplementing a TMDL$9,979NoCompletedDid start on 07/01/2016Will be Completed On 06/30/2017
    03Slowing it Down - Wetland Creation for Sawmill CreekNoBMP Design Urban Runoff/StormwaterNOT APPLICABLE (NA)$14,652NoCompletedDid start on 08/04/2016Will be Completed On 06/30/2017
    04Snow Removal Bioswales in HainesNoBMP Design Urban Runoff/StormwaterNOT APPLICABLE (NA)$10,863NoCompletedDid start on 07/05/2016Will be Completed On 06/30/2017
    05Assess Existing Waterfowl BMPs on Fish CreekNo-Other NPS Pollution; Turf ManagementImplementing a TMDL$8,500NoCompletedDid start on 07/01/2016Will be Completed On 06/30/2017
    06Kenai River Zinc and Copper Pollution ReviewNoBMP Design Construction; Land Disposal/Storage/Treatment; Resource Extraction; Urban Runoff/StormwaterNOT APPLICABLE (NA)$14,983NoCompletedDid start on 07/01/2016Will be Completed On 06/30/2017
    07Green Infrastructure Filtration for Odiak PondNoBMP Design Construction; Hydromodification; Urban Runoff/StormwaterNOT APPLICABLE (NA)$47,891NoCompletedDid start on 07/11/2016Will be Completed On 06/30/2017
    08Clean Boating in the Susitna Valley and Cook InletNoEducation/Information Marinas and Recreational BoatingImplementing a TMDL$30,500NoCompletedDid start on 07/01/2016Will be Completed On 06/30/2017
    09Green Streets and Noyes Slough AssessmentNoWater Quality Assessment/Monitoring Other NPS Pollution; Urban Runoff/StormwaterImplementing a TMDL$10,500NoCompletedDid start on 07/11/2016Will be Completed On 06/30/2017
    10Cuddy Park Ponds RehabilitationNoBMP Design Other NPS Pollution; Turf ManagementImplementing a TMDL$30,000YesCompletedDid start on 07/01/2016Will be Completed On 05/22/2017
    11Protecting Healthy Waters in the Mat-Su BasinNoGIS/Modeling Construction; Hydromodification; Other NPS Pollution; Resource Extraction; Urban Runoff/StormwaterNOT APPLICABLE (NA)$18,931NoCompletedDid start on 07/05/2016Will be Completed On 06/30/2017
    12Goldstream Creek Education and Outreach to MinersNoEducation/Information Construction; Other NPS Pollution; Resource Extraction; Urban Runoff/StormwaterImplementing a TMDL$8,764NoCompletedDid start on 08/04/2016Will be Completed On 06/30/2017
    13DEC NPS Staff Time: Project ImplementationYesNPS State Staff Activities Construction; Historical Pollutants; Hydromodification; Marinas and Recreational Boating; Other NPS Pollution; Urban Runoff/StormwaterNOT APPLICABLE (NA)$264,494No-Did start on 07/01/2016Will be Completed On 06/30/2017
    14Southeast Alaska Water Quality Data InventoryNoWater Quality Assessment/Monitoring Construction; Hydromodification; Other NPS Pollution; Resource Extraction; Urban Runoff/StormwaterNOT APPLICABLE (NA)$23,000NoCompletedDid start on 08/25/2016Will be Completed On 06/30/2017
    15DEC NPS Staff Time: Program WorkYesNPS State Staff Activities -NOT APPLICABLE (NA)$1,354,055No-Did start on 07/01/2016Will be Completed On 06/30/2017
    16Duck Creek Nancy Street Wetland Assessment, Year 2No-Urban Runoff/StormwaterImplementing a TMDL$9,997NoCompletedWill start on 07/03/2017Will be Completed On 06/30/2018
    17Integrated Report Technical SupportNoWater Quality Assessment/Monitoring Hydromodification; Marinas and Recreational BoatingDeveloping a TMDL implementation plan(s)$14,933NoPendingWill start on 12/23/2016Will be Completed On 01/04/2018
    18Stormwater Analysis on Wasilla CreekNoGIS/Modeling Agriculture; Urban Runoff/StormwaterNOT APPLICABLE (NA)$7,500NoCompletedWill start on 06/06/2018Will be Completed On 06/30/0219
    19GIS Mapping of On-site Disposal Systems along Cottonwood CreekNoOther Restoration/Protection Land Disposal/Storage/Treatment; Other NPS Pollution; Urban Runoff/StormwaterImplementing a TMDL$5,119NoCompletedWill start on 04/11/2018Will be Completed On 02/28/2019
    20Deshka River Total Aromatic Hydrocarbon (TAH) SamplingNoWater Quality Assessment/Monitoring Marinas and Recreational Boating; Urban Runoff/StormwaterDeveloping a TMDL$35,000NoCompletedWill start on 04/20/2018Will be Completed On 06/30/2019
    21Evaluate FC Data for 2 Anchorage WatershedsNoGIS/Modeling Hydromodification; Land Disposal/Storage/Treatment; Other NPS Pollution; Urban Runoff/StormwaterImplementing a TMDL$12,969NoCompletedWill start on 05/03/2018Will be Completed On 02/28/2019
    22Lower Anchor River Streambank StabilizationNoBMP Implementation Construction; Hydromodification; Marinas and Recreational Boating; Other NPS Pollution; Urban Runoff/StormwaterNOT APPLICABLE (NA)$11,095NoOn ScheduleWill start on 05/01/2018Will be Completed On 06/30/2019
    23Where does it go? Stormwater Mapping in the Haines TownsiteNoWatershed Planning Urban Runoff/StormwaterNOT APPLICABLE (NA)$2,531NoCompletedWill start on 04/01/2018Will be Completed On 02/28/2019
    242018 Kenai River Boat Count and Analysis and Turbidity MonitoringNoWater Quality Assessment/Monitoring Marinas and Recreational BoatingNOT APPLICABLE (NA)$6,418NoCompletedWill start on 05/03/2018Will be Completed On 02/28/2019
    25Outreach on Controlling Urban Runoff to Cottonwood CreekNoBMP Implementation Urban Runoff/StormwaterImplementing a TMDL$8,200NoOn ScheduleWill start on 04/20/2018Will be Completed On 06/30/2019
    26Green Infrastructure at the Botanical Garden, FairbanksNoBMP Implementation Urban Runoff/StormwaterNOT APPLICABLE (NA)$7,000NoCompletedWill start on 05/01/2018Will be Completed On 02/28/2019
    Sum : $1,996,250
    State: AK, Award Fiscal Year: 2015, Grant No: 00J84602, Grantee: AK DEPT OF ENVIRON CONSERV
     Project NumberTitleState Wide ProjectPrimary Functional CategoryCategory Of PollutionTMDLTotal 319h FundsHas Pollutant DataCurrent StatusProject StartProject End
    01Improving Water Quality in Anchorage's WaterbodiesNoBMP Effectiveness Monitoring Urban Runoff/StormwaterImplementing a TMDL$50,000NoCompletedDid start on 07/21/2015Completed on 06/30/2016
    02Clean Boating in the Susitna Valley and Cook InletNoEducation/Information Marinas and Recreational BoatingImplementing a TMDL$37,612No-Did start on 07/14/2015Completed on 06/30/2016
    03Monitoring Stormwater Discharges in CordovaNoWater Quality Assessment/Monitoring Urban Runoff/StormwaterNOT APPLICABLE (NA)$15,900No-Did start on 07/21/2015Completed on 06/30/2016
    04Jordan Creek Rain Garden and Snow Barrier FenceNoBMP Design Urban Runoff/StormwaterImplementing a TMDL$29,300No-Did start on 07/31/2015Completed on 06/30/2016
    05Fairbanks Complete Streets ConstructionNoBMP Design Urban Runoff/StormwaterNOT APPLICABLE (NA)$19,525No-Did start on 07/21/2015Completed on 06/30/2016
    06Project Green MapNoGIS/Modeling Urban Runoff/StormwaterNOT APPLICABLE (NA)$5,256No-Did start on 07/21/2015Completed on 06/30/2016
    07Sawmill Creek Low Impact Development DemonstrationNoBMP Implementation Urban Runoff/StormwaterNOT APPLICABLE (NA)$18,432NoCompletedDid start on 08/20/2015Completed on 06/30/2016
    08State NPS Staff TimeYesDevelopment of TMDLs Other NPS PollutionNOT APPLICABLE (NA)$449,820No-Did start on 07/01/2015Completed on 06/30/2016
    09Clean Boating on the SalchaNoEducation/Information Hydromodification; Marinas and Recreational BoatingNOT APPLICABLE (NA)$6,747No-Did start on 03/01/2016Completed on 06/30/2016
    10Stormwater Analysis on Cottonwood CreekNoGIS/Modeling Urban Runoff/StormwaterNOT APPLICABLE (NA)$15,000NoCompletedDid start on 03/31/2016Completed on 06/30/2016
    Sum : $647,592
    State: AK, Award Fiscal Year: 2014, Grant No: 00J84601, Grantee: AK DEPT OF ENVIRON CONSERV
     Project NumberTitleState Wide ProjectPrimary Functional CategoryCategory Of PollutionTMDLTotal 319h FundsHas Pollutant DataCurrent StatusProject StartProject End
    01Big Lake Management Plan RevisionNoWatershed Management Planning Marinas and Recreational BoatingNOT APPLICABLE (NA)$5,446No-Did start on 07/01/2014Completed on 12/31/2014
    02Snow Removal Management in the Haines BoroughNoWatershed Management Planning Urban Runoff/StormwaterNOT APPLICABLE (NA)$17,000NoCompletedDid start on 07/01/2014Completed on 06/30/2015
    03Pullen Creek Rain Garden and OutreachNoBMP Implementation Urban Runoff/StormwaterNOT APPLICABLE (NA)$18,400No-Did start on 07/01/2014Completed on 06/30/2015
    • 1 - 100 of 7,228